My WebLink
|
Help
|
About
|
Sign Out
Home
2003-09-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2003
>
2003-09-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:17:34 PM
Creation date
6/16/2005 3:09:05 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/25/2003
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\;'.J DOd-bv",,/ <br /> <br />Co. <br /> <br /> <br /> <br />Co. <br /> <br />~ <br /> <br />Post-It~ brand fax transmittal memo 7671 <br />D 'rom <br /> <br />""pt. <br /> <br />New Street Light Request Procedure <br /> <br />x <br /> <br /> <br />-'l..1... <br /> <br />I. Citizen presents official writh:::n request to Community Development. which is located on the ~econd <br />flaor of City Hall <br /> <br />2. A quick review of Ihe existing lights in the area is completed and any areas that need a light are <br />suggested <br /> <br />3. A preliminary cost estimate mUst be determined for the installation as well as maintenance of the light. <br /> <br />4 A survey is sent out to the surrounding neighborhood to find out approval rating (How many people <br />wanl the light'?). The survey should include a map of the existing lights as well as proposed lights, and <br />a cosl estimate for each lighl suggested. <br /> <br />s. Approval rating must be at least 33%. Sllrveys that arc not returned assume approval granled. <br /> <br />6 Once the survey is taken. and the approval rating is deterntined to be over 33%. the light installation <br />musl be brought before the City Council for their approval. <br /> <br />7. Once approval is granted. NSP Electric is called and the streetlight is installed. The monthly <br />m'tallation fee is added to the lighting bill for the appropriate homes. <br /> <br />npOLICY . PROCEDURES 2000ILighling Procedure doc <br /> <br />I <br /> <br />3:Jl:Jd <br /> <br />WSE/7IL IS9I: XI:J::J <br /> <br />A~n8GOOM ::JO A1IJ:GI <br /> <br />LE:SI EO, Se/EO OeL'oN 3lI::J <br />
The URL can be used to link to this page
Your browser does not support the video tag.