Laserfiche WebLink
<br />- 10- <br /> <br />BMP Page <br /> <br />MS4 Name: City of Roseville <br />Unique Identifvinq Number: 1-7 <br />Minimum Control Measures Addressed bv This BMP <br /> <br />~ Public education & outreach <br />Public participation & involvement <br />Illicit discharge detection & elimination <br /> <br />~ Construction site runoff controls <br />Post-construction storm water management <br />Pollution prevention/Good housekeeping <br /> <br />BMP Title: 30-day public notice for annual storm water meeting <br />BMP Description: The City will post a 30-day public notice prior to the annual storm <br />water meeting (UIN 2-11). The notice will contain a reference to the SWPPP, the date, <br />time, protocol and location of meeting and will indicate where a copy of the SWPPP is <br />available for public review. The meeting will be posted on the website (UIN 1-4), City <br />Hall bulletin board, local newspaper and any other location or by any means the City <br />may deem necessary or appropriate. A copy of the meeting notice will be made <br />available to the Agency, appropriate City and county officials and all other interested <br />persons. <br />Measurable Goals: Timeline I Implementation Schedule: <br />. Completed public notice . 30-day notice for annual storm <br /> requirement (y/n) water public meeting will be sent <br />. Number of locations notice was every year through the life of the <br /> posted permit <br />Specific Components & Notes (optional): <br />Responsible Person Responsible Department <br />Name: Debra Bloom Depl. or Org.: Administration <br />Title: Assl. Public Works Director/City Enqineer Depl. Head: Neal Beets <br />Phone: 651-490-2221 Phone: 651-490-2201 <br />E-mail: deb.bloom@ci.roseville.mn.us E-mail: neal.beets@ci.roseville.mn.us <br />Educational components related to this BMP (description or number - optional): <br />Audience: Roseville residents and business owners. <br />Educational Qoal: To inform the general public of the storm water meeting, date, time <br />and issues and to provide them an opportunity to participate. <br />Activity: See BMP description above <br />Implementation Plan: See Timeline/lmplementation schedule above <br />Performance Measures: See Measurable Goals above <br />