My WebLink
|
Help
|
About
|
Sign Out
Home
2003-12-18_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2003
>
2003-12-18_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:46:29 PM
Creation date
6/16/2005 3:48:37 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
12/18/2003
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- 30- <br /> <br />Illicit Discharge Detection and Elimination <br />MS4 Name: City of Roseville <br />UniQue IdentifvinQ Number: 3-1 <br />Minimum Control Measures Addressed bv This BMP <br /> <br />@ Public education & outreach <br />Public participation & involvement <br />X Illicit discharge detection & elimination <br /> <br />B Construction site runoff controls <br />Post-construction storm water management <br />Pollution prevention/Good housekeeping <br /> <br />BMP Title: Storm sewer map <br />BMP Description: The City maintains electronic maps of the storm sewer system and <br />is in the process of completing its digital documentation and verification. Any <br />changes/improvements to the system are included in periodic updates, The storm sewer <br />map will show: <br />1) Ponds, streams lakes & wetlands that are part of the MS4 <br />2) Structural pollution devices that are part of the MS4 <br />3) All pipes & conveyances in the MS4 system, as goal - but at minimum - those <br /> pipes >= 24 inches in diameter <br />4) Outfalls, including discharges from Roseville to other MS4s or waters and <br /> wetlands that are not part of Roseville (and do not have operational control); <br /> structures that discharge storm water directly into groundwater; overland <br /> discharge points and all other points of discharge from the MS4's system, not <br /> diffuse flows <br />Measurable Goals: Timeline I Implementation Schedule: <br />. Year 1 - Complete mapping and . Year 1 - Complete mapping and <br /> verification of 25% verification of 25% <br />. Year 2 - Complete mapping and . Year 2 - Complete mapping and <br /> verification of 50% verification of 50% <br />. Year 3 - Complete mapping and . Year 3 - Complete mapping and <br /> verification of 75% verification of 75% <br />. Year 4 - Complete mapping and . Year 4 - Complete mapping and <br /> verification of 100% verification of 100% <br />. <br />Specific Components & Notes (optional): <br />Responsible Person Responsible Department <br />Name: Jolinda Stapleton Dept. or Org.: Public Works <br />Title: GIS Technician Dept. Head: Duane Schwartz <br />Phone: 651-490-2225 Phone: 651-490-2220 <br />E-mail: iolinda,stapleton@ci.roseville,mn,us E-mail: duane,schwartz@ci.roseville,mn,us <br />Educational components related to this BMP (description or number - optional): <br />
The URL can be used to link to this page
Your browser does not support the video tag.