Laserfiche WebLink
<br />- 42- <br /> <br />Construction Site Runoff Control <br />MS4 Name: City of Roseville <br />Uniaue Identifyina Number: 4-1 <br />Minimum Control Measures Addressed by This BMP <br /> <br />B Public education & outreach <br />Public participation & involvement <br />Illicit discharge detection & elimination <br /> <br />B Construction site runoff controls <br />Post-construction storm water management <br />Pollution prevention/Good housekeeping <br /> <br />BMP Title: Erosion & Sediment Control (ESC) requirements and plan review <br />process (ordinance) <br />BMP Description: The City has a review and permit process in place for all <br />proposed land disturbances, meeting specified criteria, within the City. Applicants are <br />required to use temporary and permanent ESC and use best management practices <br />on the site to preserve shoreland and veqetation. <br />Measurable Goals: Timeline /Implementation Schedule: <br />. Year 1- Review existing plan . Currently in place and will continue <br /> review procedures and . Year 1- Review existing plan review <br /> standards in place procedures and standards in place <br />. Year 2- Document and . Year 2- Document and implement <br /> implement changes to review changes to review process and <br /> process and requirements (if requirements (if necessary) <br /> necessary) <br />. Number of plans reviewed <br />Specific Components & Notes (optional): <br />Responsible Person Responsible Department <br />Name: Debra Bloom Pep!. or Org.: Public Works <br />Title:Asst. Public Works Director/City Engineer Pep!. Head: Duane Schwartz <br />Phone: 651-490-2221 Phone: 651-490-2220 <br />E-mail: deb. bloom @ci.roseville.mn.us E-mail: duane.schwartz@ci.roseville.mn.us <br />Educational components related to this BMP (description or number - <br />optional): <br />Audience: Grading contractor, developer. <br />Educational qoal: To provide guidance to developer/contractor on plan review <br />procedures and minimum ESC requirements by making the ordinance available on <br />the City's web page <br />Activity: See BMP description above <br />Implementation Plan: See Timeline/lmplementation schedule above <br />Performance Measures: See Measurable Goals above <br /> .. <br />