Laserfiche WebLink
<br />- 48- <br /> <br />Post Construction Runoff Control <br />MS4 Name: City of Roseville <br />Unique IdentifvinQ Number: 5-1 <br />Minimum Control Measures Addressed bv This BMP <br /> <br />B Public education & outreach <br />Public participation & involvement <br />Illicit discharge detection & elimination <br /> <br />~ Construction site runoff controls <br />X Post-construction storm water management <br />Pollution prevention/Good housekeeping <br /> <br />BMP Title: MPCA - "Urban Best Management Practices" standard (ordinance) <br />BMP Description: The City requires all proposed storm water facilities to be certified <br />for compliance the MPCA document "Urban Best Management Practices". <br />Measurable Goals: Timeline I Implementation Schedule: <br />. Number of permanent storm water . Design standards established <br /> BMPs installed in accordance with <br /> established standards <br />Specific Components & Notes (optional): <br />Responsible Person ResDonsible Department <br />Name: Debra Bloom DeDt. or Org.: Public Works <br />Title: Asst. Public Works Director/Citv Enoineer DeDt. Head: Duane Schwartz <br />Phone: 651-490-2221 Phone: 651-490-2220 <br />E-mail: deb.bioom@ci.roseville.mn.us E-mail: duane.schwartz@ci.roseville.mn.us <br />Educational components related to this BMP (description or number - optional): <br />Audience: Developer. <br />Educational Qoal: To inform the developer of design standards in place for post <br />construction storm water management by making the ordinance available on the City's <br />web page <br />Activitv: See BMP description above <br />Implementation Plan: See Timeline/lmplementation schedule above <br />Performance Measures: See Measurable Goals above <br />