Laserfiche WebLink
<br />Roseville Public Works and Transportation Commission <br /> <br />Agenda Item <br /> <br />Date: February 24, 2004 <br /> <br />Item No: 5 <br /> <br />Item Description: Transit Shelter Discussion <br /> <br />Last summer, the Public Works Transportation Commission established siting criteria for bus <br />shelters within the City ofRoseville. These were: <br /> <br />1. The site needed to be an existing Metro Transit Bus Stop <br />2. A clear line of sight needed to be maintained for vehicles <br />3. A clear line of sight needed to be maintained for transit users. <br />4. Electric service must be available. <br />5. The shelter needed to be set back from the curb at least 4 feet. <br />6. The site must be visible for cross traffic. <br />7. The location must have a commercial! industrial land use. <br /> <br />Craig Piemot, Outdoor Promotions Inc., has requested to locate shelters at the locations shown <br />on the attached map. He will also be at the meeting to discuss these locations and answer <br />questions regarding their selection of proposed sites. Staff will provide additional comment on <br />these sites during the discussion at your meeting. Our challenge is to determine if these sites <br />meet the criteria established by the Commission. <br /> <br />Recommended Action: <br /> <br />A motion recommending the proposed bus shelter locations. <br /> <br />Move: <br /> <br />Ayes: <br /> <br />Second: <br /> <br />Nays: <br />