My WebLink
|
Help
|
About
|
Sign Out
Home
2004-10-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2004
>
2004-10-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:50:53 PM
Creation date
6/20/2005 10:50:04 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/26/2004
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Regional Cost Estimates <br /> <br />Expanding the conveyance and treatment facilities enough to eliminate the risk of an <br />overflow is not practical or feasible. The primary limitation is the need to double the capacity <br />of the Metro Plant where peak flow rates could reach over 1.3 billion gallons per day, To <br />understand the relative cost of conveying and treating excessive 1/1, capital costs were <br />estimated based on assuming a 25-year storm event occurred with the forecasted <br />development of 2030. Technically, the interceptor system must not be overloaded for any <br />rainfall condition so using a 25-year event is for comparative purposes only, Capital cost for <br />treatment plant capacity was also estimated. The cost of increasing the hydraulic capacity of <br />each plant was not estimated because of the limitations of space at each site. <br /> <br />Total capital costs based on the 25-year III event, for MCES conveyance and treatment <br />facilities needed for ultimate development, would approach a half billion in 2002 dollars, If <br />sized for the ultimate service area, the cost of these facilities would be even greater. The high <br />cost of expansion to convey III on ly provides a measure of how important III reduction is as <br />it is not feasible to construct facilities large enough to prevent an SSO. <br /> <br />7 <br />