My WebLink
|
Help
|
About
|
Sign Out
Home
2005-01-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2005
>
2005-01-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:51:39 PM
Creation date
6/21/2005 11:00:34 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/25/2005
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roseville Public Works and Transportation Commission <br /> <br />Agenda Item <br /> <br />Date: January 25, 2005 <br /> <br />Item No: 6 <br /> <br />Item Description: South Owasso Boulevard / Ladyslipper Park Concepts <br /> <br />The Public Works Department has been preparing plans for the reconstruction ofS. Owasso <br />Boulevard. This project has been considered for a two phased construction in 2005 and 2006. <br />This first phase of reconstruction would include the segment of S. Owasso Boulevard between <br />Rice Street and the railroad tracks. The second would be between the railroad tracks and Dale <br />Street. <br /> <br />Ladyslipper Park is located along the first Phase of this reconstmction project. In December, the <br />Parks and Recreation department started work with the neighborhood on a master planning <br />process for this park. City staff and consultants have held 2 planning meetings with the <br />neighborhood to help identify a plan for this park. At the last meeting, the consultants <br />introduced 3 concept plans for the park. <br /> <br />All three of the concept plans include a focus on S. Owasso Boulevard and how it relates to the <br />new Ladyslipper Park. We would like to share these three concepts with the Public Works <br />Commission and receive feedback regarding park and road interaction. <br /> <br />The next planning meeting is scheduled for February 17 at 6:30 pm. The neighborhood will be <br />presented with a final concept that pulls together all of the feedback from previous meetings. <br />This concept will then be brought to the Parks and Recreation commission for final adoption as a <br />master plan. <br /> <br />Recommended Action: <br /> <br />Provide feedback on the proposed Ladyslipper/ S. Owasso Boulevard concept plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.