Laserfiche WebLink
<br /> <br />The standard design for <br />residential streets is 32 feet <br />wide with an asphalt surface. <br />A six inch (6" high, straight- <br />face concrete curb and gutter <br />is installed at the same time. <br /> <br /> <br />Removal of underground <br />sprinkler systems in the <br />boulevard is the property <br />owner's responsibility. <br />Please make arrangements <br />to have the lines removed <br />prior to staIi of <br />constrnction. <br /> <br /> <br />The new street will be <br />constrncted to match the <br />elevation of existing driveways <br />as closely as possible. It will be <br />necessary, however, to replace <br />the end of your driveway to <br />ensnre a smooth transition to the <br />street. This replacement will be <br />in gravel, asphalt or concrete <br />depending on what material <br />existed prior to constrnction. <br /> <br />Similarly, in order to match the <br />new curb and gutter to your yard, <br />sod will be replaced adjacent to <br />the street. There is no additional <br />charge for these replacements. <br /> <br /> <br />As long as your proposed changes conform <br />to Roseville' s driveway code, additions or <br />changes to your driveway can be made with <br />the street project. You must, however, pay <br />any additional costs for extra work prior to <br />the work starting. Call the Roseville <br />Engineering Department at 651-792-7003 if <br />you would like more specific information. <br /> <br /> <br />The contractor will work closely with the local <br />post office to ensure uninterrnpted mail <br />delivery. Mail boxes will be grouped together <br />at a nearby corner. Following constrnction, <br />your mailbox will be replaced as close as <br />possible to its original location or a location <br />specified by the homeowner. <br /> <br /> <br />Mailboxes are grouped together during <br />construction. <br /> <br /> <br />Most eXlstmg roadways vary in <br />width and, therefore, some trees <br />may be affected. If it is necessary <br />to remove a tree or shrnb, the City <br />will work with the property owner <br />on its replacement. If you have <br />perennials or bulbs in the <br />boulevard, please remove them <br />prior to construction. <br /> <br /> <br />All streets when upgraded <br />are served by stann <br />drainage facilities. These <br />will be installed as part of <br />the street reconstrnction <br />project. <br /> <br /> <br />Construction usua]]y takes <br />from 3 to 5 months. <br />Contractors are required to <br />keep the road passable and <br />provide driveway access <br />whenever possible. If you <br />have special access needs, let <br />us know as soon as possible. <br />The City will provide updates <br />throughout the construction <br />project regarding the schedule. <br /> <br /> <br />