Laserfiche WebLink
<br />~ <br /> <br /><Ql004RlKKuusislo,LTO_ <br /> <br />RESPONSIBILITIES <br /> <br />THE PROPERTY OWNER OR CONTRACTOR MUST SUBMIT A COMPLETED <br />NPOES APPLICATION FORM WITH THE t400 APPLICATION FEE. <br /> <br />THE OWNER AND OPERA lOR (USUAU Y THE GENERAL CONTRACTOR) <br />AilE JOINTlY RESPONSH3LE fOR AU TERMS AND CONDITIONS OF THE <br />PERMIl. <br />PROPERTY OWNER OR CONTR....CTOR TO SUBMIT NPOES NonCE OF <br />INTENT PER!.lIT 7 DAYS PRIOR TO TliE BEGiNNING OF CONSTRUCTION_ <br />CONTRACTOR TO SUBMIT NPOES NOllCE OF TERMINATION TO MPCA <br />WITHIN ONE WEEK OF FINAL RESTORATION ACCEPTANCE. <br />CONTRACTOR TO MONITOR AND REPORT ON SlORM WATER <br />MANAG8dENT REOUIREI.!ENTS PER MPCA. <br />FOR STORM WA TEll DISCHARGES mOM CONsrnUCllON PROJECTS <br />WHERE THE OWNER OR OPERATOR CHANGES. THE NEW OWNER OR <br />OPERATOR MUST SUBMIT A SUBDIVISION REGISTRATION WITHIN SEvn-l <br />(7) DAYS OF ANY OF THE FOLLOWING: <br />1. ASSUMING OPERATlONAl CONTROL OF THE SHE. <br />2. COMMENCING WORK ON THEIR PORTlON OF THE SITE. <br />J. LEGAL TRANSFER,SALE OR CLOSING ON THE PROPERTY. <br /> <br />THE OWNER ~UST IDENTlFY A PERSON KNO'M..EDGEABLE AND <br />EXPERIENCED IN THE APPLICATION Of EROSION PREV[NTIQN AND <br />SEDIt.!ENT CONTROL Bt.lP'S 'M-lO WILL, <br />1. OVERSEE THE I!.lPLEMENTATlON OF THE S'M'PP <br />2. OV[RSEE THE INSTALLATION. INSPECTION AND "'AINTENANCE <br />OF EROSION PRE\o1::NTION AND SEDIMENT CONTROL 8'-lP'S <br />BEFORE AND DURING CONSTRUCTION. <br />THE OWNER MUST iDENTIFY WHO WILL HAVE THE LONG TER!.! <br />RESPONSiBILITY FOR LONG TER!.l OPERATION AND !.lAINTENANCE OF <br />Tl-lE PER~ANENT STORt.! WATER t.lANAGEMENT SYSTEt.! AND DEVELOP <br />A CHAIN OF RESPONSIBILITY WITH AU OPERATORS ON THE SITE 10 <br />ENSURE THAT THE swppp WILL BE IMPLEMENTED AND STAY IN <br />EFfECT UNTIL FINAL STABiliZATION AND SUBMITTAL OF THE NOT. <br /> <br />REQUIREMENTS <br /> <br />THE SWPPP MUST INCLUDE: <br />1. LOCATION AND TYPE OF ALL TEMPORARY AND PERt.lANENT <br />EROSION PREVENTION AND SEDI!.lENT CONTROL BMP'S. <br />INCLUDING PROCEDURES USED TO ESTABliSH ADDITlONAL <br />TEMPORARY B~P'S AS NECESSARY FOR THE SITE CONDITlONS <br />DURING CONSTRUCTlON. <br />2. A SITE ~AP WITH EXISTING AND FINAl GRADES. <br />J. DRAINAGE DIVIDING liNES AND DIRECTION OF FlOWS FOR PRE <br />AND POST~CONSTRUCTION STOR~ WAltR RUNOfF DRAINAGE <br />AREAS. <br />4. I~PERVlOUS AREAS AND SOIL TYPES. <br />S. LOCATION OF AREAS NOT TO BE DlSTUR8ED. <br />6. LOCATlON OF AREAS WHERE CONSTRUCTION WILL BE PHASED <br />TO ~INIMIZE DURATION Of EXPOSED SOIL AREAS <br />7. ALL SURFACE WATERS AND EXISTING WETlANDS. <br />B METHODS TO BE USED FOR FINAl STABILlZATlON OF ALL <br />EXPOSED SOIL AREAS <br /> <br />! <br />! <br /> <br />THE PERMITTEE MUST AMEND THE SWPPP AS NECESSARY TO INClUDE <br />ADDITIONAL REOU1RHIENTS, SUCH AS ADDITIONAL DR MODlrlED B~P'S, <br />DESIGNED TO CORRECT PROBLEMS IDENTIfiED OR ADDRESS SITUATlONS <br />WHENEVER: <br />1. THERE IS A CHANGE IN DESIGN. CONSmUCTION, OPERATION <br />OR ~AINTENANCE. <br />2. WEATHER OR SEASONAL CON()jTIONS THAT HAVE SIGNIFICANT <br />EFFECT ON DISCHARGE. <br />3.INSPECTlON OR INVESTIGATION BY SITE OPERATORS. LOCAL, <br />STATE. OR fEDERAL OfFICIALS INDICATE THE SWPPP IS NOT <br />EfTECTlV(. <br />4. THE SWPPP IS NOT AOlIEVlNG THE GENERAL OB..(CTIVES or <br />CONTROlliNG POLlUTANTS OR THE S'M"PP IS NOT CONSISTENT <br />WITH THE TERMS AND CONDITIONS OF THIS PERMIT. <br />S. THE MPCA DETERMINES THAT QlSOiARGE ~AY CAUSE OR <br />CONTRIBUTE TO NON-ATTAINMENT OF ANY APPllCABLE WAT(R <br />QUAliTY STANDARS DR THE S'M"PP DOCS NOT INCORPORATE <br />THE REQUIREMENTS RELATED TO AN APPROVED TOTAL MAXIMUM <br />DAILY LOAD {TMDL): THERUNCHFROt.ITHESIT(DISOiARGES <br />TO AN IMPAIRED WATER WHICH HAS AN APPROVED TMDl AND <br />HAS NOT BEEN PROPERLY DETAilED IN THE SWPPP. <br />STORM WAT(R PONDS, SEDI~ENT BARRIERS AND OTHER ~EASURES <br />INTENDED TO TRAP SEDIMENT ON-SITE WILL BE CONSTRUCTED AS A <br />FIRST STEP IN GRADING, AND WILL BE MADE fUNCTIONAl BEFORE <br />LAND DISTURBANCE TAKES PLACE UPSlOPE. EARTHEN STRUCTURES <br />SUCH AS DAMS. DIKES AND DIVERSIONS '-lUST BE SEEDED AND <br />MULCHED WITHIN 4B HOURS OF INSTALLATION. UTILITY AND PAVING <br />WORK WILL CDM~ENCE UPON COt.IPLETION or THE GRADING <br />oPERATIONS. ALL EROSION CONTROL ~EASURES AND PROTECTIVE <br />FENCING ~UST BE INSTALLED AND INSPECTED BY THE CITY OR LOCAL <br />GOVERNJ,lENT UNI1 PRIOR TO BEGlNNING OF ANY GRADING. <br />RESPREAO TOPSOIL AND ESTABLISH TURf ON AlL ROUGH GRADED <br />AREAS OTHER THAN THOSE DESIGNATED fOR PADS BITUMINOUS AND <br />CONCRETE WlTHIN 4B HOURS AFTER COMPLETION of EARTH MOY,NG. <br />GENERAL AREA SEED MIX: MNDOT SPEC. 3876.2 ~lxruRE 1300. <br />MULCH: ~NOOT TYPE 1 DISC ANCHORED, 2 TONS PER ACRE. <br />fERTILIZER: COMMERCIAL lO/10/HI (PHOSPHATE LIMITED TO NO <br />MORE THAN 400LBS. PER ACRE) <br />RESPREAD TOPSOIL AND ESTABLISH TURf ON AlL fiNAL GRADED <br />AREAS WITHIN n. HOURS AFTER COMPLETION OF FINAl GRADING <br />G<:NERAL AREA SEED MIX:~NODT SPEC. 3876_2 ~IXTURE SOB. <br />~ULCH, MNDOT TYPE 1 DISC ANCHORED. 2 TONS PER ACRE <br />fERTILIZER: COM~ERCIAl 10/10/10 (PHOSPHATE LIMITED TO NO <br />MORE THAN 400LBS/AC) <br /> <br />I,!AINTAIN ALL EROSION CONTROL ITEMS, RE!.lOVE ACCU~ULATED <br />SEDI~ENTS. CLEAN UP MUD TRACKED FRO~ TIiE SITE ON TO <br />ADJACENT STREETS, AND CONTROl DUST (PER MNDOT SPEC 2130 AS <br />NECESSARY TO ELI~INATE SIGNIFICANT OUST PER REQUIREt.lENTS or <br />ENGINEER, OWNER. AND/OR CITY, UNTIL SUCH TI!JE AS TIiE ENGINEER <br />HAS ACCEPTED THE v.ooK. <br /> <br />'0 <br /> <br />TE~PORARY STOCXPILES MAY BE LEfT ON THE SITE FOR USE IN <br />BACKFILL REPlENISH~ENT. STOCKPILES !JUST HAVE SlLT fENCE OR <br />OTHER EffECTIVE B~P'S 10 CONTROl RUNOFF. STOCKPILES CANNOT <br />BE PLACED IN SURFACE WATER CONVEYANCE DEVICES (CURB AND <br />GUTTER, SWALES OR DITCHES). TOPSOIL WILL BE RESPREAD <br />PRQGRESSIVEL Y AS THE GRADING WORK CONTINUES. IF STOCKPILES <br />ARE TO REMAIN FOR ~ORE THAN 60 DAYS, TEMPORARY SEEDING <br />MUST BE PLACED. <br /> <br />THE PERMITTEE MUST IMPLEMENT THE SWPPP AND INSTALL B"'P'S <br />IDENTlFIED IN THE SWPPP IN AN APPROPRIATE AND fUNCTlONAl <br />MANNER I <br /> <br />Tl-IE lOCATION OF AREAS NOT TO BE DISTURBED MUST BE <br />DELINEATED ON THE Silt BEfORE DE\IElOP~ENT BEGNS <br />AlL EXPOSED AREAS 'MTH A CONTINUOUS POSITlVlO SLOPE 'MTl-IIN <br />200 FEET OF A SURfACE WATER MUST HAVE TEMPORARY EROSION <br />PROltCTlON OR PERMANENT CO\o1::R fOR THE EXPOSED SOIL AREA, <br />ytAR ROUND, WlTIi THE FOllO'MNG ~AXlMUM TIMES AND AREA CAN <br />REI.IAIN OPEN W1iEN THE AREA IS NOT ACTIVELY BEING WORKED: <br />I. SlOPES STEEPER THAN 3:1 (7 DAYS). <br />2. SlOPES Of 10:1 TO 3:1 (14 DAYS). <br />J. SLOPES OF Ilkl OR fLATTER (21 DAYS). <br />Tl-iE NORMAL WETlED PERIMETER Of ANY TE~PORARY OR PER~ANENT <br />DRAINAGE DITCH THAT DRAINS WATER FROt.I A CONSTRUCTION SITE <br />OR DIVERTS WATER AROUND A SITE. MUST BE STABILIZED 'MTHIN 200 <br />FEET fROM THE PROPERTY EDGE. OR FROM THE POINT Of" DISDiARCE <br />TO ANY SURFACE WATER 'MTHIN 24 HOURS OF CONNECTING TO A <br />SURFACE WATER. <br />THE CITY 'MLl INSPECT SILT FENCE PRIOR TO ANY lAND ALTERATlON. <br />AlL SILT FENCE SHAlL BE CONSTRUCTED 'MTH WOOD OR STEEL <br />POSTS(SEEDETAlL). <br />ALL EROSION CONTROL t.lEASURES MUSl BE INSTAlLED AND <br />~AltiTAlNED ACCORDING TO THE DETAllS INClUDED IN THE <br />CONSTRUCTION DOCUMENTS_ AlL SILT MUST BE RE!.lOVED fROM SILT <br />FENCE WHEN IT REACHES A HElGHT EQUAl TO ONE-THIRD Of THE <br />HEIGHT OF THE SILT fENCE. THE CONTRACTOR MUSl PERFORM AtiY <br />CORRECTIVE MEASURES ORDERED BY THE CITY, LOCAL GOVERN~ENl <br />UNIT, DR t.lPCA 'MTHIN 24 HOURS OF SUCH NOTICE. THE CONTRACTOR <br />SHAlL AlSO PLACE ANY ADDITIONAl EROSlON CONTROL ~EASURES <br />DEEMED NECESSARY BY THE CITY OR t.lPCA 'MTHIN 24 HOuRS OF <br />NOTICE_ AlL MEASURES MUST BE REPLACED OR REPAlREO 'MTH THE <br />APPROVAL OF CITY, AND t.lPCA, WHEN THEY BECOt.IE NONFUNCTIONAL <br />ORANG<: POLY SNOW FENONG ~UST BE PLACED AROUND AU <br />NATURAL FEATlJRES THAT ARE TO BE PRESERVED. THIS INClUDES <br />ALL TRErS. WETLANDS, SLOPES, ETC. IN LOCATIONS Wl-lERE <br />PLACEMENT OF PROTECTION fENQNG COIN ODES WfTH THE PLACEt.lENT <br />Of SILT FENCE. THE lOP PORTION OF THE SILT fENCE MAY BE <br />PAlNTED ORANGE AND CAUTION RIBBON MAY BE INSTALLED IN <br />ACCORDANCE WITH THE DETAIL PROVIDED IN THE CONSTRUCTION <br />SPEOFICATlON. RIBBON MUST BE !.lAINTAINED A, AU TIMES IF THIS <br />ALTERNATIVE IS TO BE USEOIt.lENTATlDN <br /> <br />CONTRACTOR SHAlL BE RESPONSIBLE fOR KEEPING EXISTING PAVED <br />SURFACES Cl-EAN or SEDIMENT BY STREET SWEEPING ROADWAYS <br />I'IIiEN A SIGNIFICANT ACCUMULATION OF SEDIMENT OCCURS ON THESE <br />SURfACES. ANY SEDI~ENl TRACKED OFF~Sll( IS TO BE REt.!OVED <br />'MTHIN 24 HOURS. SWEEPING MUST ALSO OCCUR WHEN DIRECTED BY <br />THEOTY. <br /> <br />THE CONTRACTOR IS TO PLACE A THREE FOOT 'MDE STRIP Of SOD <br />BEHIND THE CURB FOLLOWING BACKFILLING TO PREVENT EROSION IN <br />THIS AREA.. <br />INDIVIDUAl EROSION CONTROl PLANS 'MLL BE REOUIRED fROI.l lOT <br />BUILDERS AT THE TIME Of FUTURE CONSTRUCTION <br />CONTRACTOR TO PROVIDE STRAW BALE PROTECTION AT ALL CATCH <br />BASIN INLETS (SEE DETAIL). <br />EROSION CONTROL BLANKET SHALL BE INSTALLED ON ALL SLOPES J: 1 <br />DR STEEPER <br /> <br />TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE <br />DRAlNED AND SEDiMENT REMOVED ONCE THE SEDIMENT COlLECTED <br />REACHES ONE-THIRD THE STORAGE VOLUME 'MTHIN n HOURS. AS <br />fiELD CONOlTIONS AlLOW. <br />ALL SEDIMENT DEPOSITS WITHIN SURFACE WATERS !.lUST BE REMOVED <br />AND RESTABILlZED WITHIN 7 DAYS OF DISCOVERY. THIS INCLUDES <br />DELTAS AND SlORt.I SEVltR SEDI~ENT DEPOSITS. <br /> <br />INflLTRATlON!f1LTRATlON SYSTEMS SHOULD NOT BE EXCAVATED TO <br />FINAL GRADE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN <br />fULLY STABiliZED <br />DURING EXCAVATION. SEDIMENT AND EROSION CONTROl DEVICES <br />SHOULD BE UTILIZED TO PREVENl SEOIt.lENTATION AND THE AREA <br />MUST BE STAKED OfT AND ~ARKED SO THAT HEAVY CONSTRUCTION <br />EQUIPMENT 'MLL NOT COMPACT THE S~l. <br />TO PREVENT CLOGGING OF THE SYSTEM, A PRETREAT\lENTDEVlct <br />MUST BE USED TO SETTLE PARTICULATES BEFORE RUNOFf <br />DISCHARGES INTO THE INFILTRATlON/FILTRATION SYSTEM. <br />ON-SITE TtSTlNG MUST BE CONDUCTED TO VERifY THAT A MINIMUI.I <br />OF 3 FEEl OF SEPARATION FRO~ BEDROCK OR SATURATED SOil IS <br />ACHIEVED. <br />ALL INfiLTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO <br />SEDI~ENT fROI.l ONGOING CONSTRUCTION IS REACHING THE <br />INFILTRATION AREA. <br />SEDlt.lENT CONTRa.. DEVICES MUST BE USED TO MINIMIZE SEOlMENT <br />ENl(RING SURfACE WAl(R" INCLUDING CURB AND GUTTER AND STORM <br />SE'M:RINLETS. <br /> <br />If THEDOWl'i GRADIENT TREAThlENTSYSTElJ IS OVER LOADED,THE <br />S'M"PP MUST BE AMENDED. <br /> <br />PERMIT REQUIRES THAI THERE BE NO UNBROKEN SlOPE LENGTH <br />GREATER THAN 75' FOR SLOPES 'MTH A GRADE OF 3:1 OR SltEPER. <br /> <br />ALL DOWN GRADIENl PERI~ETER SEDI~ENl CONTROLS SHOULD BE IN <br />PLACE BEFORE ANY UP GRADIENT DISTRURBANCE BEGINS. AND <br />MAINTAlNED UNTIL FINAl STABILIZATION. <br />TI~ING ANO INSTALLATION OF SEDIMENT CONTROL DEVICES CAN BE <br />ADJUSl(D TO ACCOMMODATE SHORT TER~ ACTIVITIES SUCH AS <br />D.EARlNGANDGRUBBING. <br /> <br />ALL STORM DRAIN INLETS MUST BE PR01ECTED 'MTH BMP'S <br />ROCK CONSTRUCTlON ENTRANctS OR EOUIVALDiT SYSTEM MUST BE <br />USED TO MINIMIZE TRACKING FRO!.! SITE. <br />DEWATERING- ACTIVITIES THAT ~AY HAVE SEDIMENT-LADEN DISCHARGE <br />MUST DISCHARGE INTO A TEMPORARY OR PER~ANENT SEDIMENTATION <br />BASIN 'M-IEN POSSIBLE. OTHERWISE IT ~UST BE DISCHARGED <br />THROUGH SOME fORM OF 8MP. <br /> <br />ALL OUTFLOWS FROM BMP'S MUST HAVE APPROVED ENERGY <br />DISSIPATION SUCH AS RIP RAP. <br />THE CONTRACTOR SHALL COMPLETELY REMOVE ALL TEMPORARY <br />EROSION AND SEDIMENT CONlRDl MEASURES UPON ES1ABlISHMENT <br />or fiNAl ~EASURES AND SITE STABILIZATION. CONTRACTOR SHAll <br />OVEREXCAVATE TE~PORARY SEDI~ENT POtiO BOTTOt.I IF POOR <br />SUBSOILS BECOI.lE SATURA'IED AND REPLACE WITH CQMPACl(D fiLL <br />MATERIAL PER REQUIREMENTS OF GEOltCHNICAL REPORT. <br /> <br />INSPECTION AND RECORD <br />RETENTION <br /> <br />THE swppp, AlL CHANG<:S TO IT. AND INSPEcnONS AND <br />MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING <br />CONSTRUCTION BY Tl-lE PERMITTEE 'M-l0 HAS OPERATIONAL CONTRa.. <br />OF THE PORllON 0'" THE SITE. ALL DV/NERS ~UST KEEP THE SWPPP <br />ON FILE FOR THREE YEARS AFl(R THE SUBMITTAL OF THE NOTICE OF <br />TER!.lINATION. INClUDING TIlE FDlLO'MNG- INFORMATION <br />1. ANY OTHER PERMITS REOUIRED FOR THE PRMCT. <br />2. RECORDS OF AU INSPEcnON AND !.lAlNTENANCE CONOUCl(D <br />DURING CONSTRUCTION. <br />3. AU PERt.lANENT OPERATION AND t.lAINTENANCE AGREEMENTS <br />THAT HAVE BEEN IMPLEMENTED. INCLUDING All Rlon Of WAY, <br />CONTRACTS. CO\o1::NANTS, AND OTHER BINDING REQUIREMENTS <br />REGARDING PERPETUAl MAlNl(NANCE. <br />4. ALL REOUIRED CALCULJo.TlQNS FOR DESIGN OF THE TEMPORARY <br />AND PERMANENT STORM WATER MANAGEMENT SYSlt!.lS. <br />THE PER~ITl(E ~UST RDUTlNELY INSPECT THE SlTE ONCE EVERY 7 <br />DAYS DURING ACTIvt CONSTRUCTION AND WITHIN 24 HOURS AFTER II <br />RAINfALL EVENT GREATER THAN 0_5 INCHES IN 24 HOURS. <br />AlL INSPECTIONS AND ~AltiTENANCE CONDUCTED DURING <br />CONSTRUCTION MUSl BE RECORDED IN wRITING AND RETAINED 'MTH <br />THE SWPPP. <br /> <br />RECORDS SHOULD INCLUDE: <br />1. DATE AND TIME OF INSPECTIONS. <br />2. NAAlE or PERSON CONDUCTING INSPECTlON. <br />3. fiNDING OF INSPECTION INClUDING COI1RECTI\o1:: ACTlON <br />DETAILS OF CORRECTIVE ACTION (DATE. TIME. PARTY <br />COI.IPLETING ~AINTENANCE) <br />4. DATE AND AMQUNT OF RAINFALL GREATER <br />THAN 0.5 INCHES IN 24 HOURS <br />5.0OCUMENTATlON Of CHANGES TO SWI"PP. <br />IN AREAS OF PROJECT WHERE f"lNAL STABILIZATION IS COMPLETE, <br />INSPECTIONS CAti BE REDUCED TO ONCE A MONTH. <br />INSPECTIONS CAN BE SUSPENDED DUE 10 FROZEN GROUND <br />CONDITIONS UNTIL fiRST RUNOfF OCCURS OR CONSTRUCTlON <br />ACTlVlTlES RESUME. <br /> <br />NOTICE OF TERMINATION <br /> <br />PERt.lITTEES MUST SUBMIT NOTICE Of l(RMINATION (NOT) 'MTI,IN 30 <br />DAYS IF ONE OR t.lORE Of fOLLOWING CONomONS HAVE BEEN t.lET: <br />1. FINAL STABiliZATION HAS BEEN ACHIEVED ON ALL PORTIONS OF <br />THE SITE FOR WHICH PERMITltE is RESPONSIBLE" INCLUDING <br />THE REMOVAL OF ALL TEMPORARY '-lEASURES SUCH AS- SILT <br />FENCE. <br />2. ANOTHER OW'lER HAS ASSU~EO CONTROL OVER ALL PORTIONS <br />Of" THE SITE THAT HAVE NOT ACHIEVED FINAl STABiliZATION. <br />3. IN THE CASE OF RESlDENTIAL CONSTRUCTION TEMPORARY <br />EROSION PROTECTION IINO DOW'l GRADIENT PtRI~ETER CONTROL <br />fOR INDIVIDUAl LOTS HAS BEEN COIJPLE1ED AND THE <br />RESlDENCE HAS BEE~ TRANSFERRED TO THE HOMEOI'll'lER. <br /> <br />PERMITTEE MUSl ENSURE FINAl SlABILlZATION or THE SITE AND <br />SUBMIT THE NOT WITHIN 30 DAYS OF FINAL STABILl2ATION. <br />FINAL STABILlZATlON CAN BE AQ-lIE\1:D IN THE FOl..LO'MNG WAY: <br />1. AlL SOIL DISTURBING ACTIVITIES ARE COt.lPLflt AND A <br />UNIFORI,l PERENNIAL VEGETATlVE COVER WITH A DENSITY OF 70:1: <br />OVER THE ENTIRE PERVIOUS SURfACE HAS 8EEN ACHIEVED <br />INCLUDING: <br />-SlABILlZATION OF DITDiES AND SWALES. <br />-REMOVAl OF AlL TE~PDRARY SYNTHETIC &: STRUCTURAL <br />8MP'S. <br />-RE~OVAL or SEDIMENTS FRO~ STORM WATER CONVEYANCES <br />AND PER~ANENT WATER QUALITY BASiNS. <br />fOR RESlOENTlAt DEVELOPMENTS, FINAl STABILIZATION HAS <br />BEEN ACHIEVED """EN: <br />-TEMPORARY EROSION PROTECTION AND DOlIN GRADIENT <br />PERIMETER CONTROl.. FOR INDIVIDUAL LOTS HAVE BEEN <br />COMPLETED. <br />-THE RESIDENCE HAS BEEN TRANSFERRED TO THE <br />HOt.lEOWNER, THE PER~ITTEE MUSl DISTRIBUTE THE MPCA <br />"HO!.!EOV/NER FACT SHEET" TO THE HOIJEO'M'iER. <br /> <br />SEQUENCE OF CONSTRUCTION <br /> <br />1. CONTRACTOR TO VERiFY THAT ALL PERMlTS HAVE BEEN OBTAINED. <br />2. CONTRACTOR TO SOlEDULE FIELD ~EETING 'MTH on OR LGU <br />AND/OR WATERSHED <br />J. CONTRACTOR TO INSTAll. AlL PERI~ETER SEDIMENT CONTROl <br />DEVICES. CONSTRUCTION ENTRANCES AND PROTECTIVE FENQNG <br />FOR TREES, DITCHES. EXISTING WATER BODIES AND AREAS TO <br />REMAIN UNDISTURBED. <br />-4. CONTRACTOR TO CONSTRUCT STORMWATER AND/OR TEt.lPORARY <br />SEDI~ENTATlON BASINS. <br /> <br />5. CONTRACTOR TO CONTACT OTY OR LGU AND/OR WATERSHED fOR <br />APPROVAL OF SEDIMENT CONTROl DEVICES. <br />6. CON1RACTOR TO ROUGH GRADE SITE AND INSTAlL UTILITIES. <br />7. CONTRACTOR TO INSTALL TEMPORARY EROSION CONTROl DEViCES <br />AS NECESSARY. CONTRACTOR TO FlU. TtMPORARY SEDIMENTATlON <br />BASINS. COMPACTlNG TO SPEClflED DENSITIES. REMOVE ALL <br />UNSUITABLE SEDIMENT PER RECQlJMENDATlON Of GEOTECHNICAL <br />ENGINEER. <br />8. €ONTRAC1OR TO INSTALL SUBBASE AND BASE fOR PAVEMEN1. <br />9. CONTRACTOR TO INSTALL BITUMINOUS SURfACE. <br />10. CON1RAC1OR TO INSTALL EROSION CONTROL BLANKETS VI1TH <br />PERMANENT SEED MIX. <br /> <br />11. ONCE ALL DISTURBED AREAS HAVE BEEN STABILIZED. OBTAlN <br />APPROVAL FROM THE OTY ENGlNEER AND 'MTHIN TWO WEEKS or <br />FINAl STABIUZATlQN <br /> <br />12. CONTRACTOR TO REMDVlO SEDIMENT CONTROl DEVICES WITHIN TWO <br />WEEKS OF APPROVAl. <br /> <br />1J. SUBMIT NOTICE OF TERMINATlON 'MTHIN 30 DAYS Of FINAl <br />STABILIZATION. <br /> <br />B"O~~5IW(RIN'[l <br /> <br />... -I ANCHO" WIlH Two Sl.^~[S <br />. . . D""'[~ IN1Q G"CUNO <br />SALE DIV[RS'ON '0 P~()T[[1 STORM <br />S[W[",Nl(1S1'NClDEN'AL10CDNS'"UC< <br />R[-I;ON,'RUClORAO.'US1<;.'1C>i""SI>:) <br /> <br />ANCNOR[D ,;", CCNCE ( SC'[[~II'G AiSO ACC["IA"l[ <br />WLlH APP"OVAL 6Y (~~'N[[I', <br /> <br />EROSION CONTROL <br /> <br />CoIl ~8 Hours before diqging <br />GOPHER STATE ONE CALL <br />Twin Cilies Area 651--i54-CKXl2 <br />UN. Toll free 1-800-252-1166 <br /> <br />~ <br /> <br /> <br />,. - ~" WASH[D ROO< <br /> <br />IB""'N''''UWo.lTorrBERw10 <br />..tNf"'~E RUNoFF rRDM SHE <br /> <br />rrUERrABRICSHAl.lBE <br />f>lAC[D u~D[R ROCK To STOP <br />"uDWI(;IlAlIONTHROlJGH <br />"= <br /> <br />"''''''''''''''''''- <br /> <br />GRADING DETAIL <br /> <br />/", <br />RLK - <br />~~ <br /> <br />GRD-06 <br /> <br />ROC><CONSTRuclION EtHlIANCE <br /> <br />VARI[S <br /> <br />flOIl' <br /> <br /> <br />TEMPORARY BASIN CROSS SECTION <br /> <br />TRASHRAD< <br />"OUNTINGSRAO<El <br /> <br />'iHASHRAO<W/J/'" <br />DiA_SARSS"O,C. <br /> <br /> <br />2;' <br /> <br />'"!!l" <br /> <br />J6"OIA.R,5[R <br /> <br />'B"OIA,PRECAST <br />CONc."ANHOI.rSA5[ <br /> <br />12"OIA <br /> <br />PERFORATED OUTLET <br /> <br />"""""00/1>/0> <br /> <br />STORM SEWER <br /> <br />/", <br />RLK <br />"C7 <br /> <br />E:.SE <br /> <br />STM-18 <br /> <br />ll'IJf'!)RARY5[D""[NTATlONSA-SO" <br /> <br />2" x 2" lI'OOO DR Sll'El r(~cr <br />Posl B' "AXI..UW 5PAONG <br /> <br />~., <br /> <br /> <br />YolRE "ESH RE'NfDRcrWE;~T. sm_ <br />nHD FE;Ncr. "I,,-J<j" HIGH. <br />"AX. "ESH sPAONG G" AND <br />"'N.l4ji:AU!;(""RL <br />C(ortXTllE;fAElRIC-OVERlAP <br />FABRLCS'A"O,ASl[NA12' <br />'Nl[RVA(S <br /> <br />o <br /> <br />l ~ <br />, <br /> <br />3t]" > <br />",-' ,38 <br />U ~. .... .' "!. <br />. .. "'~ <br />,- <br />"" <br /> <br />[Xlo,m""R,,,cSH j <br />'NlomrNCH <br /> <br />;""~"~, <br />ANO<ORA(;EtNSOOloR <br />CE"(NT"OR'A-RAS <br />sP(CIREO <br /> <br />!:!mJ::,ATTACH fASRICTo <br />"'R("[S"ANDSUPPoRl <br />POSTS""lHRtNGSDR""RE <br />"" <br /> <br />"~5W""N/O' <br /> <br />GRADING DETAIL <br /> <br />/", <br />RLK <br />''C7' <br /> <br />:=::.~ <br /> <br />GRD-D2 <br /> <br />surENC(_H!;AVYDUTY <br /> <br />I <br /> <br />,", <br />no <br /> <br />~~ ~ <br />~~~ ; <br />~! i,_ <br />~:: ~ : <br />ii:..... i <br /> <br />i:H <br />~~! <br />~:~ <br /> <br />. <br /> <br />(~~)! <br /> <br />, <br />:;~~ <br />l!i <br />l;, 5 ~ <br />1:5'" <br />'~r,; <br />i!n <br />~~~ ~ <br /> <br />m~ <br /> <br />_ E ~~ <br /> <br />~ <br /> <br />o <br />, <br />u <br />o <br /> <br />. <br />j <br />, <br /> <br />J <br /> <br />Mo <br />, , , 8 <br />~ ~ "" ~ <br />'" w 0: r <br />'" 0 0 .., <br /> <br />m <br />z <br />o <br />Vi; <br />~ <br />oc <br /> <br /> <br />-J <br />~ <br />a <br />g: <br />Q <br /><<:: <br />).. <br />I- <br />G <br />~ <br />~ <br />~ <br />~ <br />I- <br />lLJ <br />U) <br /><: <br /><<:: <br />~ <br /> <br />>-< <br />UlZo <br />Wm <br />W::;w <br />~o..~ <br />:3os <br />-' - <br />~~ <br />;;:W. <br />>-Ow <br />w8 <br /><roc <br /> <br />Ul <br />-' <br />;;' <br />>- <br />W <br />o <br />"- <br />"- <br />~ <br />Ul <br /> <br />t.tci <br />~U <br /> <br />, ~ <br />N 0 <br />U"'l~........ <br />::; ""N <br />00.::::.. <br />~ ~ <br />