Laserfiche WebLink
<br />TCMRF Single-Sort Constituent Test <br /> <br />The TCMRF operates two shifts. In order to allow for the complete segregation of test <br />materials, the tipping floors and feed pits for the single-sort process system and container <br />process system were emptied and cleaned. All systems storage bunkers and enclosures <br />were also empty at the start of the test. <br /> <br /> <br />Figure 1 - Siugle-sort System Infeed Before Start <br /> <br /> <br />Figure 2 - Container System Infeed Before Start <br /> <br />All of the trucks were dumped on the tipping floor for the single-sort process system <br />prior to starting processing operations. Otherwise, loading of the system proceeded <br />according to normal practice by use of a bucket loader. <br /> <br />3 <br />