My WebLink
|
Help
|
About
|
Sign Out
Home
2005-11-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2005
>
2005-11-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 4:00:34 PM
Creation date
9/11/2006 9:18:50 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/22/2005
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br /> <br />CONCLUSIONS AND RECOMMENDATIONS <br /> <br />I. CONCLUSIONS: <br />All portions of the project as proposed are feasible. <br /> <br />Estimated project cost: <br /> <br /> Total City of City of <br /> Project Cost Falcon Heights Roseville <br />Street Reconstruction $741,984.38 $370,992.19 $370,992.19 <br />Storm Sewer Construction $68,875.00 $34,437.50 $34,437.50 <br />Sidewalk Construction $99,875.00 $49,937.50 $49,937.50 <br />Watermain Reconstruction $182,812.50 $0 $182,812.50 <br />Total $1,093,546.88 $455,367.19 $638,179.69 <br /> <br />II. RECOMMENDATIONS: <br /> <br />1. Reconstruct Roselawn Avenue from Hamline Avenue to Snelling Avenue. <br />2. Construct a 34- foot wide bituminous street with concrete B618 curb and gutter. <br />3. Allow parking along the north side of the street. <br />4. Construct a sidewalk along the south boulevard. The sidewalk design shall be a 8 foot <br />wide attached concrete. <br />5. Install EVP system for TH 51/ Roselawn Avenue signal system. <br />6. Construct turn lanes at the TH 51/ Roselawn A venue and the Hamline/ Roselawn Avenue <br />intersections. <br />7. Costs for the road reconstruction, storm sewer, and sidewalk construction shall be shared <br />50/50 between Falcon Heights and Roseville <br />8. The sidewalk shall be funded with Municipal State Aid funds. <br />9. Each City shall fund the street reconstruction with Municipal State Aid funds and <br />assessments as detailed in this report. <br />10. The utility improvements shall be funded by the individual City with the appropriate City <br />Infrastructure fund. <br />II. Begin construction of this project in Spring 2006, completion by the 2006 State Fair as <br />proposed in this report. <br />12. Schedule a public hearing before the City Council; in Roseville on Monday, January 9, <br />2006 and in Falcon Heights on Wednesday, January II, 2006. <br /> <br />Project P-ST-SW-06-02 <br />Roselawn Avenue Reconstruction <br /> <br />Feasibility Report <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.