My WebLink
|
Help
|
About
|
Sign Out
Home
2006-02-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2006
>
2006-02-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 4:08:46 PM
Creation date
9/11/2006 9:49:42 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/28/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Erosion control references in City Code: <br /> <br /> <br />1008.10: PROCEDURE FOR PROCESSING A PUD: <br /> <br />D. Final Development Plan: Following general concept development approval, if given, <br />the applicant shall submit the final development stage application and final plat. The <br />application shall proceed and be acted upon in accordance with section 1015.01 of <br />tllis title for zoning district changes. If appropriate, because of the limited scale of <br />the proposal, the concept stage and development stages may proceed simultaneously. <br />2. Applications: Ten (10) copies of the following exhibits, analyses and plans shall <br />be submitted to the city (general concept plan): <br />d. Final Plan Stage: Final plan stage submission should depict and outline the <br />proposed implementations of the general concept plan for the PUD. Information <br />from the general concept plan may be included for background and to provide a <br />basis for the submitted plan. The final plan stage submissions shall include, but <br />not be limited to: <br />(2) Ten (10) sets of preliminary plans drawn to a scale of not less than one <br />inch equals One hundred feet (I" = 100') (or scale requested by the <br />administrator) containing at least the following information: <br />(J) General grading and drainage plans for the developed PUD. <br />(8) Preliminary grading and site alteration plan illustrating changes to existing <br />topography and natural site vegetation. The plan should clearly reflect the site <br />treatment and its conformance with the approved concept plan. <br />(10) A soil erosion control plan acceptable to watershed districts, depa11ment <br />of natural resources, soil conservation service or any other agency with review <br />authority clearly illustrating erosion control measures to be used during <br />construction and as permanent measures. COrd. 1082, 1-14-1991; amd. 1995 <br />Code) <br /> <br /> <br />SECTION: <br />1010.01: Additional Requirements for all Zoning Districts Except <br />
The URL can be used to link to this page
Your browser does not support the video tag.