Laserfiche WebLink
<br />Table 4-11 <br />MnDOT Highway Work Plan, 2009-2013 <br />Major Construction, ReconstructIon and Bridge Replacement Greater Than $10 Million <br /> <br /> Prolect Cost Estimates <br /> Design RIW Year-of- Con.frnction Total <br /> Project Construction Estimate Estimate Construction Engineering Project <br />Hi~hway Description Program Fi.cal Year ($000) ($000) Estimate Estimate Cost <br /> ($000\ ($000) ($000) <br />35E 1-94 to Maryland MC 2010 7,687 Limited 76,755 6,140 90,571 <br /> Ave. i:Q St Panl, <br /> grading, surfacing, <br /> hrs., etc., including <br /> Cayuga Br. aud <br /> Phalen Blvd. <br /> connection <br />35W At Lake St. in MC 2009 1,160 Contin- 11,600 928 13,688 <br /> Minneapolis, nous! <br /> reconstruct jnter~ Major <br /> chanee (Ph. I) <br />35W At Lake St. in MC 2010 1,785 Contino 17,850 1,428 21,063 <br /> Minneapolis, now <br /> reconstruct inter- Major <br /> chanee (Ph. 2) <br />36 At Lexington MC 2009 1,380 Limited 13,804 1,104 16,289 <br /> A vc.. in Roseville, <br /> replace Br. 5723 <br /> and recol15trnct <br /> interchanee <br />100 36" St. to Cedar MC 2011 6,150 Contin- 61,500 4,920 72,570 <br /> Lake Rd. in St uous! <br /> Louis Park, Major <br /> grading, surfacing, <br /> Brs., etc. for 6-lane <br /> freewav <br />169 Near CSAH 6 in MC 2010 1,904 Limited 19,040 1,523 22.467 <br /> Belle Plaine, <br /> grading, surfacing, <br /> Br" etc. for new <br /> interchange <br />694 E of135W in MC 2012 6,960 Minimall 69,596 5,568 82,123 <br /> Arden Hills to E of Spot <br /> Lexington Ave.. in <br /> Shoreview, <br /> grading, surfacing, <br /> Brs., etc. to add <br /> third lane and <br /> correct weave at <br /> TH 10!51 <br /> TOTALS 27,015 270 145 21,611 318,771 <br /> <br />98 <br />