<br />Table 4-11
<br />MnDOT Highway Work Plan, 2009-2013
<br />Major Construction, ReconstructIon and Bridge Replacement Greater Than $10 Million
<br />
<br /> Prolect Cost Estimates
<br /> Design RIW Year-of- Con.frnction Total
<br /> Project Construction Estimate Estimate Construction Engineering Project
<br />Hi~hway Description Program Fi.cal Year ($000) ($000) Estimate Estimate Cost
<br /> ($000\ ($000) ($000)
<br />35E 1-94 to Maryland MC 2010 7,687 Limited 76,755 6,140 90,571
<br /> Ave. i:Q St Panl,
<br /> grading, surfacing,
<br /> hrs., etc., including
<br /> Cayuga Br. aud
<br /> Phalen Blvd.
<br /> connection
<br />35W At Lake St. in MC 2009 1,160 Contin- 11,600 928 13,688
<br /> Minneapolis, nous!
<br /> reconstruct jnter~ Major
<br /> chanee (Ph. I)
<br />35W At Lake St. in MC 2010 1,785 Contino 17,850 1,428 21,063
<br /> Minneapolis, now
<br /> reconstruct inter- Major
<br /> chanee (Ph. 2)
<br />36 At Lexington MC 2009 1,380 Limited 13,804 1,104 16,289
<br /> A vc.. in Roseville,
<br /> replace Br. 5723
<br /> and recol15trnct
<br /> interchanee
<br />100 36" St. to Cedar MC 2011 6,150 Contin- 61,500 4,920 72,570
<br /> Lake Rd. in St uous!
<br /> Louis Park, Major
<br /> grading, surfacing,
<br /> Brs., etc. for 6-lane
<br /> freewav
<br />169 Near CSAH 6 in MC 2010 1,904 Limited 19,040 1,523 22.467
<br /> Belle Plaine,
<br /> grading, surfacing,
<br /> Br" etc. for new
<br /> interchange
<br />694 E of135W in MC 2012 6,960 Minimall 69,596 5,568 82,123
<br /> Arden Hills to E of Spot
<br /> Lexington Ave.. in
<br /> Shoreview,
<br /> grading, surfacing,
<br /> Brs., etc. to add
<br /> third lane and
<br /> correct weave at
<br /> TH 10!51
<br /> TOTALS 27,015 270 145 21,611 318,771
<br />
<br />98
<br />
|