Laserfiche WebLink
<br />conditions not listed below. All requests shall indicate the <br />specific site conditions present and a grading plan, utility plan, <br />and the submittal requirement listed in the Table 2. <br /> <br />Table 2. <br />Alternative Com <br />T e <br /> <br />Iiance Site Conditions* <br />S ecific Site Conditions <br />Potential Stormwater Hotspots <br /> <br />Potential Contamination (PSHs) <br />Contaminated Soils <br /> <br /> <br />Submittal Re uirements <br />PSH locations and flow paths <br /> <br />Permitted Brownfield, Soil <br />Borin s <br /> <br />Physical Limitations <br /> <br />Low Permeabili (T e D Soils) <br />Bedrock within 3 vertical feet of <br />bottom of infiltration area <br />Seasonal High Groundwater <br />within 3 vertical feet of bottom of <br />infiltration area <br />Karst Areas <br /> <br />Soil Borin s <br />Soil Borings <br /> <br />Soil Borings <br /> <br /> <br />Soil Borin s <br /> <br />Land Use Limitations <br /> <br />e, the volume reduction standard <br />t is not possible because of site conditions <br />Iternative Compliance Sequencing steps <br />own: <br /> <br />(i) t shall comply or partially comply with the <br />tion standard to the fullest extent practicable on-site <br />alt ative volume reduction methods as listed in the <br />guidance materials. <br /> <br />(ii) Second, for the remaining volume reduction required to fully <br />meet the standard, the applicant shall comply or partially comply <br />with the volume reduction standard at an off site location or <br />through the use of qualified banking credits as determined by <br />Rule C - 3.c.4. <br /> <br />. Volume reduction may be accomplished at another site <br />outside of the project area or through the use of banked <br />credits as long as it yields the same volume reduction <br />benefit, and is approved by the District. When possible, <br />off site compliance and banking credits shall be <br />achieved in the same drainage area as the project site or <br />downstream in the same sub-watershed as the project <br />site. <br /> <br />06/12/2006 CRWD DRAFT 14 <br />