Laserfiche WebLink
<br />that the structures and facilities function as originally designed. The <br />maintenance responsibilities must be assumed by either the municipality's <br />acceptance of the required easements dedicated to stormwater management <br />purposes or by the applicant executing and recording a maintenance <br />agreement acceptable to the District. The recordable executed agreement must <br />be submitted to the District prior to issuance of permit. Public developments <br />will require a maintenance agreement in the form of a Memorandum of <br />Agreement or an approved Local Water Management Plan that details the <br />methods, schedule and responsible parties for maintenance of stormwater <br />management facilities for permitted development. A single Memorandum of <br />Agreement for each local government unit may be used to cover all <br />stormwater management structures and facilities required herein, including <br />volume reduction BMPs, within the LGU's jurisdiction. <br /> <br />4. <br /> <br />EXHIBITS. The following exhibits must acc <br />One set, full size; one set, reduced to II "x 17" <br />electronic .pdfformat. <br /> <br /> <br />pany the permit application. <br />d a copy of all submittals in <br /> <br />(a) Property lines and delineation of! <br /> <br />(b) Delineation of the drainage ar <br />and existing sub-watersheds 0 <br /> <br />'ng runoff from off-site, proposed <br />ency overflows, and drainage ways. <br /> <br />ing body downstream of site. <br /> <br />water facilities location, alignment, and elevation. <br /> <br />(e) Delineation of <br />areas. <br /> <br />ite wetland, marshes, shore land, and floodplain <br /> <br />(f) Identification of existing and proposed normal, ordinary high and 100-year <br />water elevations onsite. <br /> <br />(g) Identification of existing and proposed site contour elevations with at least a <br />2-foot contour interval. <br /> <br />(h) Construction plans and specifications of all proposed stormwater management <br />facilities, including design details for outlet control structures. <br /> <br />(i) Stormwater runoff volume and rate analysis for the 2-year, 10-year, and 100- <br />year critical storm events, existing and proposed. <br /> <br />G) All hydrologic, water quality and hydraulic computations completed to design <br />the proposed stormwater management facilities. <br /> <br />06/12/2006 CRWD DRAFT <br /> <br />16 <br />