My WebLink
|
Help
|
About
|
Sign Out
Home
2006-08-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2006
>
2006-08-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 4:14:34 PM
Creation date
9/11/2006 11:20:07 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/22/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Type of Construction Proposed Stormwater Standards. <br />New 2: 1.0 acre impervious . Rate control for the 1- and I DO-year events <br />. Water quality/infiltration for the 2.8-inch event <br />New < 1.0 acre impervious . Rate control for the 1- and I DO-year events <br />. Water quality/infiltration for the 0.8-inch event <br />Rural to Urban Section . Rate control for the 1- and I DO-year events <br /> . Water quality/infiltration for the 0.8-inch event <br />Expansion / Reconstruction . Rate control for the 1- and I DO-year events <br />. Water quality/infiltration for the 0.8-inch event <br />Mill & Overlay . Exempt <br />Pervious Pavement or Pavers <br /> <br />.[Exceptions include: I) documented soil contaminants precluding the use of infiltration practices, 2) soil borings <br />documenting high water table preventing adequate separation from water table and 3) linear projects less than 100 <br />LF. In these instances, use of structural devices such as swirl separators or catch basin sumps could be accepted.] <br /> <br />As can be seen in the figure below, implementation of these standards District-wide over time <br />can result in fairly significant watershed pollutant load reductions. For additional information <br />and implementation examples on the recommended standards for linear projects, visit the <br />District's TAC webpage (specifically the memo dated 8/5/05). <br /> <br />Figure 5. Watershed Loading Reductions realized from Linear Project Standards <br />t' 10.0 <br />c <br />.. <br />.. <br />- <br />.. <br />c.. <br />'" <br />:: 8.0 <br />;:: <br />- <br /> <br />Mesotrophic <br /> <br />- <br />'"' <br />'"' <br />.. <br />~ <br />~ <br /> <br />6.0 <br /> <br />>. <br />- <br /> <br />- <br />.. <br />::J <br />0' <br /> <br />4.0 <br /> <br />Eutrophic <br /> <br />.. <br />.. <br />- <br />- <br />.. <br />::: <br /> <br />2.0 <br /> <br />Hypereutrophic <br /> <br />0.0 <br /> <br />o <br />Wetland Susceptibility & Management <br /> <br />Emmons & Olivier Resources, Inc. <br /> <br />+ <br /> <br />Turtle (43%) <br /> <br /> <br />Johanna (31 %) <br /> <br />+ <br /> <br />+ ~.... <br />! ++ <br />.\ ++/~:+ <br />51 ver + <br />(33%) <br /> <br />- Valentine (21%) <br /> <br /> <br />+ <br /> <br />/' <br />+ <br /> <br />+ <br /> <br />50 <br /> <br />100 <br /> <br />150 <br /> <br />200 <br /> <br />Page 60f8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.