Laserfiche WebLink
Planning Commission Meeting <br />Minutes – Wednesday, March 07, 2007 <br />Page 4 <br /> <br /> <br />City Planner Thomas Paschke advised that Commissioners, at their discretion, could <br />choose to direct staff to make such notification to interested property owners a <br />condition of approval, as had been done with other PUD applications, to continue <br />interaction between the applicant and residents. <br /> <br />Mr. Lindgren advised that the college would very much like to continue having <br />neighborhood dialogue. <br /> <br />Mr. Larson requested that such a condition be in writing, not just verbal, and included <br />in the approval. Mr. Larson opined that past expectations of neighbors for <br />development at the college had not been realized. <br /> <br />Mr. Larson further requested that another condition include an annual review by the <br />college to ensure that the buffer, berm and screening was maintained to avoid <br />degradation. <br /> <br />Mr. Lindgren, on behalf of the college, was supportive of such a condition in concept; <br />however, asked that specific regulations be provided to allow the college to know what <br />was expected of them. <br /> <br />Mr. Larson thanked college personnel for solving the refuse hauling operation <br />violations. <br /> <br />Mr. Lindgren advised that he would need to leave the meeting at this time; and <br />introduced Ms. Amy Cary, Vice President of Advancement; and Brian <br />Humphries, Vice President of Facilities at Northwestern College. <br /> <br />Annette Phillips, 3084 Shorewood Lane, RV <br />Ms. Phillips addressed the perceived erosion from building #8 to into Lake Johanna; <br />and questioned when that would be addressed. <br /> <br />City of Roseville Community Development Director John Stark advised that he and <br />Associate Planner Bryan Lloyd had visited the site and, while some tree roots were <br />exposed, the level or erosion didn’t appear to be due to construction, but it appeared <br />to have occurred naturally over time. Mr. Stark asked that concerned residents <br />contact staff and meet with them on site to review their specific concerns. Mr. Stark <br />noted that, during the construction process, substantial levels of protection were <br />required when construction was adjacent to bodies of water, and were monitored <br />during the Building Permit approval process by the City’s Design Review Committee <br />(DRC) made up of staff from numerous City departments to review building plans and <br />means for effective erosion-control measures. Mr. Stark noted that the slope was <br />steep and there was some natural erosion, which may be addressed through ground <br />coverings or some other mitigation options, which could be reviewed, and such a <br />condition would be supported by staff. <br /> <br />Further discussion included the viability of a road around the proposed field house <br />(Building #25); and it’s elevation, with the building proposed to be built on stilts, the <br />field elevated, and the road on a lower grade. <br /> <br />City Engineer Debra Bloom noted that circulation and signage of mitigation bullet point <br />number 3 of the staff report addressed that issue and impacts to the bluff and Lake <br />Johanna, and erosion control. <br /> <br /> <br />