Laserfiche WebLink
<br />Alternative Property <br /> acquisition <br />I 2525 Fairview <br />2 2575 Fairview <br />3 2558 Fairview <br /> 2557 Beacon <br />4 2558 Fairview <br /> 2557 Beacon <br /> 2551 Beacon <br /> 2544 Beacon <br />5 2558 Fairview <br /> 2565 Beacon <br /> 2571 Beacon <br />6 1725 Rose PI <br />Pink 2562 Fairview <br /> 2671 Beacon <br />Yellow 2550 Fairview <br /> 2545 Fairview <br /> <br />James Addition Access Alternatives <br />Property Impacts <br />9/22/06 <br /> <br /> <br />2551 Beacon <br />2550 Beacon <br />2545 Beacon <br />2550 Fairview <br /> <br />2557 Beacon <br />2562 Fairview <br /> <br />2562 Fairview <br />2550 Beacon <br /> <br /> <br />1733 Rose PI <br />1719 Rose PI <br />2575 Fairview <br />2558 Fairview <br />2525 Fairview <br />2544 Fairview <br />2551 Beacon <br />2558 Fairview <br /> <br />2575 Fairview- <br />loses 14 stalls <br />2525 Fairview- <br />loses 40 stalls <br /> <br />2544 Fairview <br />2551 Beacon <br /> <br />. Property Acquisition: entire parcel needs to be acquired, and buildings demolished. <br />. Right- of- way Acquisition: A portion of the property needs to be acquired for the new road. <br />. Setback non-conformance: The existing buildings can stay in place, however the property <br />no longer meets setback. This can mean additional compensation for the properties that is <br />not included in the estimates. <br />. Parking non-conformance: Parking stalls will be lost due to the proposed intersection work, <br />reducing the overall parking on the site. There is not a location on the site that meets <br />setback for the parking to be replaced. These businesses will not meet the City's parking <br />requirements. <br />