Laserfiche WebLink
<br />DRAFT <br /> <br />D. DENSITY OF INTENSITY OF LAND USE <br /> <br />The College currently has 1,650 full time equivaient students with 514 associated <br />staff and faculty. There are twelve (12) academic buildings on 107 acres. With the <br />proposed increase in buiidings, ioial campus usage wiii be nineteen (19) buildings. <br />Building square footage will increase from the current approximate 471,000 square <br />feet, or 10.1 %, to approximately 809,000 square feet, or 17.4%. With the proposed <br />increase to 2,400 FTE's and the related increase in staff and faculty (168), total <br />campus usage will be 3,082. Impervious surface on the campus currently represents <br />approximately 951,390 square feet. With proposed improvements, impervious surface <br />will increase to 1,117,159 square feet. <br /> <br />The proposed improvements are expected to be phased in over the next 12 to 20 <br />years. As these capital improvements are made, related improvements for surface <br />water management, traffic, and parking will be made to accommodate student/faculty <br />enrollment growth. <br /> <br />E. DEVELOPMENT TIMELlNE AND GENERALIZED STAGING SCHEDULE <br /> <br />Based on the Master Plan that was developed in 2003, over the course of 12 to 20 <br />years, there are many proposed improvements, renovations, additions, and other <br />modifications. These proposed projects will address on-campus housing, parking, <br />traffic, surface water, and classroom/office space issues faced by the College now <br />and with growth in the number of students, faculty, and staff. In discussions with the <br />College, the 2003 Master Plan has been used as a baseline and updated with new <br />information to develop a potential phasing of the improvements. The projects listed <br />below are preliminary and many are conceptual at this point. Over the course of 12 to <br />20 years, many changes could occur and this Phasing Plan is provided with <br />information known at this time. Reference the 2003 Master Pian map along with the <br />newly developed Master Plan Scope located in the Appendix. <br /> <br />Northwestern College Master Plan <br />PUD Application Report <br /> <br />5 <br /> <br />13529.000 <br />