My WebLink
|
Help
|
About
|
Sign Out
Home
2007-03-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2007
>
2007-03-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 4:16:46 PM
Creation date
6/7/2007 11:00:45 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/27/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Roseville <br />Storm Water Pollution Prevention Program <br />NPDES PHASE II <br />Open Meeting March 27, 2007 <br /> <br />1. Public Education and Outreach measures <br /> <br />Roseville Wrap: 7 articles, 5 times per year <br /> <br />2. Public Participation and Involvement Measures <br /> <br />Spring: Cleanup: The City holds a cleanup program allowing residents to drop off <br />items. <br /> <br />Totals: <br /> <br />MSW (trash) - 17.74 tons <br />C & D (construction & demo) - 176 tons <br />Metals* - 10.91 tons <br />Batteries - 1,424 lbs. <br />Tires - 159 <br />Appliances** - 40 <br />Electronics - 4,215Ibs. <br /> <br />* includes washers, dryers, water heaters, and microwaves <br />* * includes dehumidifiers, refrigerators, and freezers <br /> <br />3. Illicit Discharge Detection and Elimination Measures <br /> <br />Storm Sewer Map: Approximately 100% of our network has been mapped by <br />GPS. <br /> <br />4. Construction Site Storm Water Runoff Control Measures <br /> <br />Construction Site Implementation of Erosion and Sediment Control BMPS: <br />Number of plans reviewed - 126 <br /> <br />5. Post-Construction Storm Water Management Measures <br /> <br />Vegetative Stabilization: Construction sites stabilized - 4 <br /> <br />6. Pollution Prevention and Good Housekeeping Measures <br /> <br />Leaf Pickup Prog:ram: City picked up and recycled 20,000 c.y. of leaves which <br />decomposes to 5,000 c.y. of compost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.