Laserfiche WebLink
City of Roseville 2008 Fee Schedule <br />Mechanical Permit Fee -Residential: <br /> <br />Air conditionin -new $ 40.00 $ 41.00 <br />Air conditionin - r lacement 50.00 52.00 <br />Warm air furnace -new 85.00 87.00 <br />Warm air furnace - re lacement 50.00 52.00 <br />Hot water boilers -new 85.00 87.00 <br />Hot water boilers - re lacement 50.00 52.00 <br />Unit heaters 50.00 52.00 <br />Swimrnin 1 heaters 50.00 52.00 <br />Misc. work & as i in 1.25% of 'ob cost 1.25% of 'ob cost <br />Minimum fee 50.00 52.00 <br />Gas fire ;lace $ 50.00 $ 52.00 <br />Movi Permit Fee: <br />Plumbing Permit Fee: <br /> <br />Administrative/minimum fee $ 50.00 $ 52.00 <br />Additional for each fixture o nin 9.00 9.25 <br />Miscellaneous work 1.25% of 'ob cost 1.25% of 'ob cost <br />Backflow revention verification $ 23.00 $ 23.50 <br />Plan Review Fee: <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for a}I buildings, except for construction costs in R-1 and R•2 <br />zones which do not involve new single family structures and are of less than fifteen thousand <br />dollars ($1.8,000.00}, shall be sixty five percent (6S%) of the building permit fee as set forth in <br />Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 1110, 4.13- <br />1992) <br />8 <br />Mechanical Permit Fee -Commercial: <br />