Laserfiche WebLink
City of Roseville 2008 Fee Schedule <br />Electrical Permit Fees <br />A. Minimum fee for each separate inspection of an installation, replacement, <br />alteration or repair is limited to one inspection only: <br />$ 27.00 $ 35.00 <br />B. Services, changes of service, temporary services, additions, alterations or repairs <br />on either primary or secondary services shall be computed separately: <br />0 to 300 am $50.00 $ 50.00 <br />301 to 400 am SS.00 58.00 <br />401 to 500 am 72.00 72.00 <br />SO1 to 600 am 86.00 86.00 <br />601 to 800 am 114.00 114.00 <br />801 to 1,000 am 142.00 142.00 <br />1 001 to 1,100 am 156.00 156.00 <br />1,101 to 1,200 am 170.00 170.00 <br />Add $i4 for each add'I 100 am s <br />C. Circuits, installation of additions, alterations, or repairs of each circuit or sub- <br />feeder shall be computed, separately, including circuits fed from sub-feeders and <br />including the equipment served, except as provided for in (D) through (K): <br /> <br />0 to 30 atn $ 8.00 $ 8.00 <br />31 to 100 am 10.00 10.00 <br />101 to 200 am 15.00 15.00 <br />201 to 300 am 20.00 20.00 <br />301 to 400 am 25.00 25.00 <br />401 to 500 am 30.00 30.00 <br />SOl to 600 am 35.00 35.00 <br />601 to 700 am 40.00 40.00 <br />Add $S for each add'1.100 am <br />D. Maximum fee for single-family dwelling shall not exceed $150.00 if not over <br />200-ampere capacity. This includes service, feeders, circuits, fixtures and <br />equipment. The maximum fee provides for not more than two rough-in <br />inspections and the final inspection per dwelling. Additional inspections are at <br />the re-inspection rate. <br />13 <br />