Laserfiche WebLink
City of Roseville 2008 Fee Schedule <br />Demolition Permit Fee: <br /> <br />Tenant im rovement/remodelin rior to buildin rmit $56.00 $58.00 <br />Structures not connected to utilities 56.00 58.00 <br />Residential structures connected to cit utilities 114.00 117.00 <br />Commercial structures connected to cit utilities $257.00 $2b5.00 <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used tv defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000) <br />Grading,Plan Review Fee: <br /> <br />50 cubic ands or less $0 $0 <br /> $54.00 for the first 10,000 cubic $56.00 for the first 10,000 <br />51-100,000 cubic yards yards, plus $27.00 for each cubic yards, plus $27.00 for <br /> additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $297.00 for the first 100,0 $300.00 for the first 100,000 <br />100,001 - 200,000 cubic yards cubic yards, plus $15.00 for cubic yards, plus $16.00 for <br /> each additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $444.00 for the first 200,000 $457.00 for the first 200,000 <br />In excess of 200,000 cubic yards cubic yards, plus $8.00 for each cubic yards, plus $9.00 for each <br /> additiona110,000 yards or additiona110,000 yards or <br /> fraction thereof fraction thereof <br />6 <br />