My WebLink
|
Help
|
About
|
Sign Out
Home
res_10597
Roseville
>
City Council
>
City Council Resolutions
>
10xxx
>
10500
>
res_10597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2008 11:01:14 AM
Creation date
3/6/2008 10:55:37 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Meeting Date
2/25/2008
Resolution #
10597
Resolution Title
Resolution Supporting the Request For State Funds in the 2008 Capital Bonding Bill for the Amount of $1,826,000 for Capital Improvements and Renovations at the Guidant John Rose Minnesota OVAL
Resolution Date Passed
2/25/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Guidant John Rose Minnesota OVAL <br />Health and Safety Improvements <br />Operational Efficiencies and Enhancements <br />Estimated Costs <br />Install Facility Monitoring System <br />• Install security cameras to better monitor activity throughout facility to ensure <br />safety of visitors and staff This technology is especially important at all facility $ 50,000 <br />access points <br />• Improve staffing efficiency and effectiveness by directing staff to needed areas <br />and identified issues <br />Replace OVAL Scoreboard and Timing Mechanism <br />• Current technology is obsolete and expensive and challenging to maintain <br />• Provide better service for regional, national and international events <br />• Expand marketing opportunities to attract more corporate and civic involvement $ 250,000 <br />Co offset capital and operating expenses <br />Install Gas Warming and Snow Melt Pit at OVAL <br />• Snow melting and warming area will increase efficiency when. removing or <br />cleaning ice $ 85 000 <br />• Minimize use of heavy equipment while participants are on the ice„ making the <br />OVAL a safer place for participants, spectators and staff <br />Replace OVAL Sound System <br />• Improve aging sound system to provide a coordinated "All-Call" function for the <br />safety of participants and staff <br />• Better control and monitoring of activities will improve participant safety $ 55,000 <br />• Expand facility-wide communications system while minimizing sound levels in <br />adjacentneighborhoods <br />Upgrade OVAL Rink Divider Pads <br />• Replace and repair aging rink pads used to divide infield and track activities, new <br />equipment is better designed to help prevent serious injury $35,000 <br />• New pad materials allow for easier movement of equipment by staff leading to <br />better efficiencies and improved safety for staff <br />Repair OVAL Tarmac -Training Track <br />• Mill and blacktop outer perimeter track surrounding the OVAL $ 100,000 <br />• Eliminate cracks and potholes and create a smooth, safe training surface <br />Improve OVAL Skate Park Equipment <br />• Repair and replace outdated wood equipment with better designed pieces made <br />
The URL can be used to link to this page
Your browser does not support the video tag.