Laserfiche WebLink
re uired b ~ revisions $57.00 $58.70 <br />Demolition Permit Fee: <br />- Electrical Permit Feer <br />Set through yearly contract with Contract Electrical Inspector <br />_. Fire Safety Inspection Fee: <br />An amount equal to eight percent (8°/a) of the amount determined by t he Building Permit Fee (except for <br />single-family dwellings) to be charged and used to defray the cost of fir e safety inspections (Ord. 1237; 3- <br />13-2000, eff. 5-1-2000) <br />Gradine Plan Review Fee: <br />50 cubic ards or less $0 $0 <br /> $54.00 for the first ] 0,000 cubic $56.00 for the first ] 0.000 <br /> yards, plus $27.00 for each cubic yards, plus $27.00 for <br /> additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $297.00 For the first 100,000 $300.00 for the frst 100,000 <br /> 100,001. - 200,000 cubic yards cubic yards, plus $15.00 for cubic yards, plus $16.00 for <br /> each additional 10,000 yards or each additional ] 0,000 yards or <br /> fraction thereof fraction thereof <br /> $444.00 for the first 200,000 $457.00 for the first 200,000 <br /> In excess of 200,000 cubic yards cubic yards, plus $8.00 for each cubic yards, plus $9.00 for each <br /> additional ] 0,000 yards or additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> <br />Page I 1 of 20 <br />