Laserfiche WebLink
Nd-NE)~T has'scheduled a project ctn,TH <br />' <br />' 651-792-7042; or, meiP a latter. prior to <br /> 280` <br />11 2009 to <br />address the changes the hearing. ;' <br /> frbin test yeas `, 3. fax a letter to 651-782-7040 prior to <br /> The pubfic is encouraged to attend a the public hearing. <br /> public. hearing for the TH 280 project, 4. Send an email to <br /> proposed for; 2008. The preliminary ,deb.bloom@ci.rosevi~m. n~• <br /> IayouE • and categorical exclusioh 5. See the staff 'report available at <br /> documentation for this project 8re htter:J/www.ci:roaevflfe mnyw/ <br /> available at Roseville City Hall, in the on December 12, 2008. After the <br /> office of the- City Engineer. Project hearing, review the meeting minutes <br /> Description: and actions of the City Coundl. <br /> • At County Road B: Permanent (Roseville fleview: Nov. 11, 2008) <br /> .removal of the signal. Construct a cul- <br /> de- sac on the- east side of TH280. <br /> Awes On the-:west side of TH280 will <br /> remain open.. with only aright-in/ rigM- <br /> ' out access. <br /> • At Broadway: Reinstall signal. <br /> Broadway will be limited to right-in/ right- <br /> out access, and northbound- to <br /> westbound access only. This will allow <br /> continuous flow for northbound TH 280 <br /> traffic. No turns from eastbound <br /> Broadway to northbound TH 280 will be <br /> allowed. <br /> • Reconstruction frontage road and add <br /> a concrete barrier on the west side of TH <br /> 280. <br /> The City of Roseville held a public <br />_ hearing for a similar project along <br /> TH28b on December 2, 2002. At which <br />CITY OF RO$EVILLE time, the•' City '::Council provided <br />PUBLIC WEARING NOTICE municipal consent for the proposed <br />Notlce is ilsnlby glren that the impacts a County Road B and similar <br />ROSEVILLE CIT1f COUNCIL wi0 hold a impacts at Broadway. The TH 280 <br />regular meeting in the City Council Project was originally scheduled for <br />Chambers at City Nelt, 2660 Civic reconstruction in 2005. However, due to <br />Center Drive, on Monday,: Depmber funding shortfalls, the Minnesota <br />15, 2008 at 6:00 p.m. to insider the bepartment of Transportation delayed <br />following public hearing: the TH 280 project until 2009 or 2010. <br />State P~Iect Wo• g2,g1-57R Questions regarding this project should <br />Trunk HIgL~v 2i~0Y ~ r_-•.nr.. be directed to Marc Gcess, Minnesota <br />'~ Department of Transportation, 651-234- <br />In2007, after the collapse of the I-35W 7716. <br />bridge over .the Mississippi River, Individuals with a .disability who need a <br />Mn/DOT utilized TH 280 as a detour reasonable accommodation to <br />route for I-35W. To increase capacity Participate, please contact Kent <br />and improve safety on ttie highway, the Barnard, Minnesota Department of <br />traffic signals at County. Road-B and Transportation, 65f-234-7504, <br />Broadway Ave were. removed entirely How to particlpete In the Public <br />and all local access to TH280 was Hearing: <br />temporarily closed witli pOrteDle barrier 1. Attend the Public Hearing & testify or <br />Now that 1-35W bridge is reopened, , view the meeting on Cable Channel 16 <br />~~ <br /> • 2. Call bebra Bloom, City Engineer U <br />