My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1379A
Roseville
>
City Council
>
City Council Ordinances
>
1300
>
ord_1379A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2010 10:02:34 AM
Creation date
1/16/2009 10:57:24 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/17/2008
Ordinance Title
AN ORDINANCE ADOPTING THE 2009 FEE SCHEDULE
Ordinance Summary
2009 Fee Schedule
Ordinance Date Passed
11/17/2008
Ordinance Date Published
11/25/2008
Resolution #
1379
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2009 Fee Schedule <br />Demolition Permit Fee: <br /> <br />Tenant im rovement/remodelin rior to buildin ermit $58.00 $61...00 <br />Structures not connected to utilities 58.00 61.00 <br />Residential structures connected to city utilities 117.00 122.00 <br />Commercial structures connected to cit utilities $265.00 $27.00 <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%} of the amount determined by the Building Permit Fee <br />{except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000} <br />Gradin@ Plan Review Fee: <br /> <br />50 cubic ards or less $0 $0 <br /> $56.00 for the first 10,000 cubic $100.00 for the first 10,000 <br />51 - 100,000 cubic yards yards, plus $27.00 for each cubic yards, plus $30.00 for <br /> additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $300.00 for the first 100,000 $400.00 for the first 100,000 <br />100,001. -- 200,000 cubic yards cubic yards, plus $16.00 for cubic yards, plus $20.00 for <br /> each additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $457.00 for the first 200,000 $b00.00 for the first 200,000 <br />In excess of 200,000 cubic yards cubic yards, plus $9.00 for each cubic yards, plus $10.00 for <br /> additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br />
The URL can be used to link to this page
Your browser does not support the video tag.