Laserfiche WebLink
City of Roseville 2009 ~'ee Schedule <br />Mechanical Permit Fee -Residential: <br /> <br />Air conditionin -new $ 41.00 $ 43.00 <br />Air conditionin - r lacement 52.00 55.00 <br />Warm air furnace -new 87.00 9i .00 <br />Warm air furnace - r lacement 52.00 55.00 <br />Hot water boilers -new 87.00 91.00 <br />Hot water boilers -replacement 52.00 55.00 <br />Unit heaters 52.00 55.00 <br />Swimmin ool heaters 52.00 55.00 <br />Misc. work & as iping 1.25% of job cost 1.25% of 'ob cost <br />Minimum fee 52.00 55.00 <br />Gas fi lace $ 52.00 $ 55.00 <br />Mechanical Permit Pee -Commercial: <br />All commercial work 1.25% of job cost 1.25% of job cost <br />Moving Permit Fee: <br />Plumbing Permit Fee: <br /> <br />AdministrativeJminimum fee $ 52.00 $ 55.00 <br />Additional for each fixture o enin 9.25 9.75 <br />Miscellaneous work 1.25% of job cost 1.25% of'ob cost <br />Backflow prevention verification $ 23.50 $ 24.50 <br />Plan Review Fee: <br />When a: building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-1 and R-2 <br />zones which do not involve new single family structures and are of less than seven thousand <br />dollars ($7,000.00}, shall be sixty five percent (65%) of the building permit fee as set forth in <br />Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 1110, 4-13- <br />1992} <br />9 <br />