My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0126_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0126_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 3:24:10 PM
Creation date
4/20/2009 9:31:00 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EA GLE SIDING, INC. <br />I30I E. Cliff Rd. Suite 11 � <br />Burnsville, Mn 55337 <br />Description <br />Wherever railings meet the wal] we �vi11 reEnove end spindie <br />and replace wi�h a continunus �+nod piece ����apped in <br />alu�trinum. We +i'ill then connect railings [o this me�nber. <br />VVrap all brick:nold around doors and windo�vs. <br />Electrica[; "Cake aff existing lights on ihe back of buildings <br />and one light on the froni of garage and replace ���ith ne�ti <br />liglits. The [ight in the front of die garage ���if] I�ave a motion <br />sensor devise. Replace extcrior outle[s ���ith izew� GF] <br />autlets and install in-use co�=ers. Lighis and outlets �vithin <br />the patio area ofeac� unit are nat included and would be at <br />an additiona[ cost. This ���ill be rec�uired «�ith th� ciecirical <br />permit. <br />Instal] gah�anized (2G gauge) chimney cap on al] chimney <br />chase tops. This does not include replacemcnt of any <br />existing ��enting materials. <br />install ne�v doors ta the paFio area in the front oFeacli uniE. <br />Remove existing door and install ne�v steel dooe-. Tf�e doors <br />�vill have to be pre-cut in order to fit the esistine aper�ing. <br />Tl IAIVKS I=OR CI-IOOSE]�G EAGL.E SID[NG! <br />Qty <br />� <br />38 <br />3 <br />���1� <br />� <br />Attachment E <br />�S�'1�'F"l��G' <br />Date Estima... <br />G/11l2008 1G46 <br />Project <br />Viny] �stimate <br />cost Tofal <br />.i5.00 175.00 <br />79.00 3.402.00 <br />433.00 <br />3 805.00 <br />3 485Aa <br />TOfal <br />1,299.00 <br />2.�] 5.00 <br />1,45a.p0 <br />I�lote: Material prices are escalating monthly. Eaele Siding. ]nc reserves the right to adjust estimate according to increase by <br />manufactumrs. Pajm�ent �vill be made at agreed upon inter�als. it is understond that a 1 t/2%Per tr�onth charge is added to <br />balance .i0 days past d�e. $2Q �vill be charged on returned cliecks. <br />Phone # Fax # E-mail Web Site <br />952-746-304b 95�-746-.i047 caglesiding,c coR�cast.net t��ww.eag[esiding,com <br />$95.94;.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.