Laserfiche WebLink
2009 — 2018 Capital Improvement Plan <br />Item: Street Lighting Division: Public Works <br />Year: 2009 - 2018 Cost: $70,000 <br />Status: Unfunded <br />Description: <br />City-owned street light poles will require replacement at the end of their useful lives. Poles <br />along the Prior/Perimeter Drive and Co Road S2 Sridge segments have been identified as being <br />in need of replacement. <br />Justification: <br />See above description. <br />Zdin Sources <br />Pro ert t�es $ 70,000 <br />Other - <br />Total Sources $ 70,000 <br />enditures <br />Ca ital re lacement $ 70,000 <br />Other - <br />Total Exnenditures $ 70,000 <br />Funding Sources <br />Property t�es <br />Other <br />Total Sources <br />Costs <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� � � <br />� 2010 2011 2012 2013 2014-2018 <br />�----- <br />������ <br />a����� <br />������� <br />Other $- $- $- $- $- <br />Total Ex enditures $ - $ - $ - $ - $ - <br />** No operational costs are shown. There is no significant change in operational costs. <br />.o - <br />$- <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />51 <br />