Laserfiche WebLink
Q. The Public Entity has supplied to the State Entity all other items that the State <br />Entity may reasonably require. <br />Section 6.05 Construction Inspections. The Public Entity and the Architect, if any, <br />shall be responsible for making their own inspections and observations of the Construction <br />Items, and shall determine to their own satisfaction that the work done or materials supplied by <br />the Contractors to whom payment is to be made out of each Advance has been properly done or <br />supplied in accordance with the Construction Contract Documents. If any work done or <br />materials supplied by a Contractor are not satisfactory to the Public Entity or the Architect, if <br />any, or if a Contractor is not in material compliance with the Construction Contract Documents <br />in any respect, then the Public Entity shall immediately notify the State Entity, in writing. The <br />State Entity and the Inspecting Engineer, if any, may conduct such inspections of the <br />Construction Items as either may deem necessary for the protection of the State Entity's interest, <br />and that any inspections which may be made of the Project by the State Entity or the Inspecting <br />Engineer, if any, are made and all certificates issued by the Inspecting Engineer, if any, will be <br />issued solely for the benefit and protection of the State Entity, and the Public Entity will not rely <br />thereon. <br />Article VII <br />MISCELLANEOUS <br />Section 7.01 Insurance. The Public Entity shall, upon acquisition of the ownership <br />interest delineated in Section 2.02, insure the Facility, if such exists, in an amount equal to the <br />full insurable value thereof by self insuring under a program of self insurance legally adopted, <br />maintained and adequately funded by the Public Entity or by way of builders risk insurance and <br />fire and extended coverage insurance with a deductible in an amount acceptable to the State <br />Entity; and shall name the State Entity as loss payee thereunder. If damages which are covered <br />by such required insurance occur, then the Public Entity shall, at its sole option and discretion, <br />either, (i) use or cause the insurance proceeds to be used to fully or partially repair such damage <br />and to provide or cause to be provided whatever additional funds that may be needed to fully or <br />partially repair such damage, or (ii) sell its interest in the damaged Facility and portion of the <br />Real Property associated therewith in accordance with the provisions contained in Section 4.01. <br />If the Public Entity elects to only partially repair such damage, then the portion of the <br />insurance proceeds not used for such repair shall be applied in accordance with the provisions <br />contained in Section 4.02 as if the Public Entity's interest in the Real Property and Facility had <br />been sold, and such amounts shall be credited against the amounts due and owing under Section <br />4.02 upon the ultimate sale of the Public Entity's interest in the Real Property and Facility. If the <br />Public Entity elects to sell its interest in the damaged Facility and portion of the Real Property <br />associated therewith, then such sale must occur within a reasonable time period from the date the <br />damage occurred and the cumulative sum of the insurance proceeds plus the proceeds of such <br />sale must be applied in accordance with the provisions contained in Section 4.02, with the <br />insurance proceeds being so applied within a reasonable time period from the date they are <br />received by the Public Entity. <br />Generic GO Bond Proceeds 25 Ver-6/26/08 <br />Grant Agreement for Construction Grants (Gnrc GO GA-Cnstrctn Grnt) <br />