My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0323_ Packet_Exec
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0323_ Packet_Exec
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 3:38:29 PM
Creation date
4/20/2009 12:58:49 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />Attachment A <br />may prevent the Contractor from traveling its accustomed route for <br />the purpose of collecting recyclables. The Contractor agrees not to <br />make any claim for compensations against the City for such <br />interference. The City shall, whenever possible, provide to Contractor <br />information and instructions about how the Contractor may best <br />provide services in the improvement area. <br />19. Educational Materials. The Contractor and the Recycling Coordinator <br />shall work together in the preparation and distribution of educational <br />materials to insure accurate information and program directives. The <br />City will pay for and distribute educational materials, not including <br />supplemental material distributed by the Contractor during the Clean- <br />Up Day event. <br />20. Termination: The City may cancel the Contract if the Contractor fails <br />to fulfill its obligations under the Contract in a proper and timely <br />manner, or otherwise violates the terms of the Contract if the default <br />has not been cured after 90 days written notice has been provided. <br />The City shall pay Contractor all compensation earned prior to the <br />date of termination minus any damages and costs incurred by the <br />City as a result of the breach. If the contract is canceled or <br />terminated, all finished or unfinished documents, data, studies, <br />surveys, maps, models, photographs, reports or other materials <br />prepared by the Contractor under this agreement shall, at the option <br />of the City, become the property of the City, and the Contractor shall <br />be entitled to receive just and equitable compensation for any <br />satisfactory work completed on such documents or materials prior to <br />the termination. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.