Laserfiche WebLink
sed chan�es (CIP Attachment B <br />Proposed Water Sources. Does your current CIP include the addition of new wells or intakes? <br />❑ Yes � No If yes, list the number of new installations and projected water demands from <br />each for the next ten years. Plans for new production wells must include the geologic source <br />formation_ well location_ and brobosed bumbin� cabacitv. <br />Water Source Alternatives. If new water sources are being proposed, describe alternative <br />sources that were considered and any possibilities of joint efforts with neighboring communities <br />for development of supplies. <br />See SPRWS. The City of Roseville has a 20 year contract with SPRWS for water supply. <br />Preventative Maintenance. Long-term preventative programs and measures will help reduce <br />the risk of emergency situations. Identify sections of the system that are prone to failure due to <br />age, materials or other problems. This information should be used to prioritize capital <br />improvements, preventative maintenance, and to determine the types of materials (pipes, valves, <br />couplings, etc.) to have in stock to reduce repair time. <br />Roseville has an average of 30 water main breaks per year. To reduce the number of breaks, we <br />are proposing a 10 year Capital Improvement Program to replace or rehabilitate $1,000,000.00 of <br />cast iron water main each year. Also as part of the 10 year Capital Improvement Program we <br />propose to upgrade the older electrical controls, and replace some pumps at the booster station to <br />high efficiency models. <br />lr-Water supply�lan2 template[1] <br />9 <br />