Laserfiche WebLink
METROPOLITAN COUNCIL <br />PART IV. ITEMS FOR METROPOLITAN AREA PUBLIC SUPPLIERS <br />Minnesota Statute 473.859 requires water supply plans to be completed for all local units of <br />government in the seven-county Metropolitan Area as part of the local comprehensive planning <br />process. Much of the required information is contained in Parts I-III of these guidelines. <br />However, the following additional information is necessary to make the water supply plans <br />consistent with the Metropolitan Land Use Planning Act upon which local comprehensive plans <br />are based. Communities should use the information collected in the development of their plans <br />to evaluate whether or not their water supplies are being developed consistent with the Council's <br />Water Resources Management Policy Plan. <br />Policies. Provide a statement(s) on the principles that will dictate operation of the water supply <br />utility: for example, "It is the policy of the city to provide good quality water at an affordable <br />rate, while assuring this use does not have a long-term negative resource impact." <br />It is the policy of the City of Roseville to provide quality water that meets or exceeds drinking <br />water standards at an affordable rate without having a negative impact on resource sustainability. <br />Impact on the Local Comprehensive Plan. Identify the impact that the adoption of this water <br />supply plan has on the rest of the local comprehensive plan, including implications for future <br />growth of the community, economic impact on the community and changes to the <br />comprehensive plan that might result. <br />This water supply plan supports the anticipated land uses prescribed in the city's Comprehensive <br />Plan. <br />Demand <br />Year <br />'ro.jections <br />Total <br />Community <br />Population Average Day <br />Served Demand <br />2010 36000 same 5.7 <br />2020 37000 same 5.75 <br />Maximum Pro,jected <br />Day Demand Demand <br />(MGD) (MG� <br />15.5 2080 <br />15.8 2100 <br />2030 38300 same 5.9 16.2 2153 <br />Ultimate NA NA NA NA NA <br />Population projections should be consistent with those in the Metropolitan Council's 2030 <br />Regional Development Framework or the Communities 2008 Comprehensive Plan update. If <br />population served differs from total population, explain in detail why the difference (i.e., service <br />to other communities, not complete service within community etc.). <br />NA <br />PLAN SUBMITTAL AND REVIEW OF THE PLAN <br />The plan will be reviewed by the Council according to the sequence outlined in Minnesota <br />Statutes 473.175. Prior to submittal to the Council, the plan must be submitted to adjacent <br />lr-Water supply�lan2 template[1] <br />23 <br />