My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0511_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0511_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:43:33 PM
Creation date
7/28/2009 2:21:37 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.O REVIEW OF ZONING/PLANNED UNIT DEVELOPMENT <br />5.1 A PLANNED UNIT DEVELOPMENT (PUD) is a zoning district which may include single or <br />mixed uses on one or more lots or parcels, and is intended to be used in unique situations <br />to create a more flexible, creative, and efficient approach to the use of the land subject to <br />the PUD procedures, standards, and regulations contained in the City Code. <br />5.2 The end result of xEZONiNG a property to PUD is the creation of a customized zoning <br />district (i.e., a PUD Agreement) that regulates the use and development of a specific <br />subject property in the same way that standard zoning districts regulate other properties. <br />Aspects of such a development may deviate from the requirements of a standard zoning <br />district, but they must be approved by the City Council and specified in the PUD <br />Agreement in order to ensure that the overall development is in keeping with general <br />guidance of the Comprehensive Land Use Plan. The PUD Agreement, if approved in the <br />FINAL phase of the PUD review process, will comprise the development parameters on <br />which the xEZONiNG is based. <br />5.3 In the GENExAL CoNCEPT phase, a preliminary development proposal is formally <br />presented in a public hearing to the Planning Commission for consideration. As the name <br />indicates, the GENExAL coNCEPT of a development is considered in this first phase; a <br />proposal may lack significant detail, but the Planning Commission and City Council have <br />the opportunity to help guide the development to ensure that it advances the land use <br />goals and policies expressed in the Comprehensive Plan. If a development is approved in <br />concept, the applicant then refines all of the technical plans to verify that the approved <br />concept is feasible in reality and then submits those plans for final approval by the City <br />Council. <br />5.4 Secause a PUD is intended to provide flexibility with respect to standard zoning <br />requirements on a property, it's useful to identify where the proposed PUD district would <br />differ from the standards of established zoning districts; the following table illustrates the <br />proposed differences: <br />Existin Zonin Standards Pro osed Conditions <br />R-1 zonin on 1126 Sandhurst Drive <br />Parkin setback from side ro ert line: 5 ft. 0 ft. from internallot line <br />Maximum im ervious covera e: 30% 64% (storm water runoff e uivalent to 0%) <br />B-3 zonin on 2167 Lexin ton Avenue <br />Parkin setback from Sandhurst Drive ROW: 15 ft. Varies from 0 ft. to 6 ft. <br />Parkin setback from Lexin ton Avenue ROW: 15 ft. 10 ft. <br />Parkin setback from internal side ro ert line: 5 ft. 0 ft. from internal lot line <br />Parkin setback from side ro ert line: 5 ft. 10 ft. from auto arts ro er <br />Buildin setback from Coun Road B ROW: 30 ft. 7 ft. <br />Buildin setback from Lexin ton Avenue ROW: 30 ft. 10 ft. and 4 ft. <br />The most significant of the above deviations from the standard zoning requirements are <br />related to the proposed location of the building adjacent to County Road S(northern <br />portion) and Lexington Avenue and the northeast portion of the parking lot. All other <br />typical zoning requirements (e.g., setbacks, number and size of parking spaces, building <br />height, etc.) not identified in the preceding table are met by the proposed redevelopment. <br />PF09-003 RCA 051109.doc <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.