Laserfiche WebLink
329 B. Northwestern College, 3003 Snelling Avenue <br />330 For the first phase of their Campus Master Plan, Northwestern College reconfigured the <br />331 private roads and constructed a parking ramp on their campus. They installed <br />332 underground retention areas and rain gardens to meet the City's storm water <br />333 requirements. <br />334 <br />335 <br />336 <br />337 <br />338 <br />339 <br />340 <br />C. Rainbow Foods, 1201 Larpenteur Avenue <br />This proj ect was the demolition of the buildings on the northeast corner of Fernwood and <br />Larpenteur Avenue to construct a new Rainbow Store. The property owner, Roundy's <br />installed underground retention areas to meet the City's storm water requirements. Since <br />this site is located in Problem Area 7: Como Sub 7- Gottfried Pit, we required that the <br />runoff from the site be reduced to resolve a proportionate share of the problem, consistent <br />with the City's CSWMP. <br />341 D. Chianti Grill, 2050 Snelling Avenue <br />342 Last year, the Backyard Bar and Grill restaurant site, located at the Snelling Avenue <br />343 access to HarMar was redeveloped. The developer constructed an extensive underground <br />344 storm water retention system and rain gardens to meet the City's storm water <br />345 requirements. <br />346 E. Har Mar Outlot, 1490 County Road B <br />347 This new commercial property was constructed on the northeast corner the HarMar <br />348 Shopping Center. The developer installed underground retention areas and rain gardens <br />349 to meet the City's storm water requirements. <br />350 F. Midland Grove Condos, 2220 Midland Grove Road <br />351 To address runoff issues in their courtyard, the Midland Grove Condominium <br />352 Association constructed a large rain garden in their courtyard. <br />353 <br />354 <br />355 <br />356 <br />357 VI. <br />358 <br />359 <br />360 <br />361 <br />362 <br />363 <br />364 <br />365 <br />366 <br />367 <br />368 <br />369 <br />370 <br />G. TCF Bank, 1445 County Road B <br />The developer has installed an infiltration/ retention area to meet the City's storm water <br />requirements. <br />Other Drainage Items <br />A. Rain Garden Workshop <br />On Thursday, May 8th, City Staff along with Ramsey Conservation District (RCD) <br />sponsored a free Rain Garden Workshop. Information was provided to residents on the <br />following: <br />1. How and why rainwater gardens can improve and protect the quality of our lakes, <br />streams, and wetlands. <br />2. How to assess your yard for locating a rainwater garden <br />3. How to properly design a rainwater garden <br />4. How to install a rainwater garden <br />5. Available financial assistance from different government agencies <br />Staff was very pleased with the turnout at this workshop, 25 participants representing 18 <br />properties attended this workshop. <br />City of Roseville <br />2008 Storm Water Annual Report <br />Page 10 of 14 <br />