Laserfiche WebLink
Page 1 of 1 <br />Thomas Paschke <br />From: <br />Sent: Sunday, March 01, 2009 11:45 AM <br />To: Thomas Paschke <br />Cc: <br />Subject: 2025 County Road B <br />Dear Sir: <br />I have been informed of the proposed multi-family building at 2023 County Road B. I am concerned that any <br />excavation in that area may disturb the underground water flow and will impact the Midland Grove Condos. <br />As you may know, last year the Midland Grove Condo Association spent hundreds of thousands of dollars <br />correcting water issues in the underground garages. Any digging near there may change the flow of the <br />water underground and may perhaps direct it into the condo area, thus undoing what was done last year. <br />I am requesting that the City of Roseville require the developer to do an environmental impact assessment <br />that specifically address the potential water issues and consult with the environmental firm, Barr <br />Engineering, that handled the water project at Midland Grove Condos. <br />Please enter my concerns into the minutes at the hearing on March 4, 2009. <br />Ruth Marston <br />Owner <br />03/02/2009 <br />