Laserfiche WebLink
� <br />1= i, ` <br />HOTitt'S �0� G2�t�idt1bl15 <br />Com�liance with A��licable Code l�epuirement� <br />The final plat includes all of the utilit�T and drainage easemenrs xec�uired b}r the City. In addition, as <br />outlrned in the PUr7 application, the final plat camplies tvith all of the a�plicable building anci safet�7 <br />cades. <br />Outstandin Issues <br />The Dedication of the Pub�ic Road�vay within the 5ite <br />r�s otitlit�ed in thc PUD a�plication, the countj� and the cit�T are rer�uiring tleorl to ded.icate the <br />portion of �iJest Snelling Diive �vitlun the site. CuxrentT��, the city has a pertnanent easeme�it o�rer the <br />roa� £or pu�lic road, high�vay and uci]it�J purposes, which is Schedule Ii2-11, Doc. Na 1.79542G ancl <br />amended by Doc. No. 3952167. It is sha�vn as S�.IZVICE DRIVE at� the plat, but the name of this <br />�oad has not been selected at this time and must be detexmined before the appro�Tal of the final plat. <br />In addit�on, to £ully �und the pxoject, i�eon needs to dedicate the road�va�� after it campletes the <br />Phase I improvements because dedicating the toadwa�r before reconstruction �vill reducc the amount <br />of lo�v income housing ta� credits the �roject «ill receive. According to federal latv, the amount of <br />lo�v incorne housing tax credits a praject receives is based on the amount of construction acti�Tities <br />within the project's property boundai-�. Dedicat'tng the road�vay prior to reconstruct�on �vould move <br />it outside the projec�s property bounda.ry, rhus �educing the amaunt of funding for the overall <br />project. To resolve the issue, Aeon, tf�e cit�� and the cou�ity could �inalize t�ie plat �vith the road <br />easement in place, and A.eon could sign a legal ag�eernent �vith rhe c�unty and the ciry stating that <br />Aean �vi21 dedicate the road and replat it after construction is complered. This agreement zuill need <br />furthe� explotation. <br />MN-DOT's Propetty Overlaps the Northwest Corr�et ofAeon's Properry <br />Schedu�e 82-9 is a fi�al ce��ificate for high�vay purposes, Doc: No. 1020360. T'his easernent overla.ps <br />the sauth seven acres by appro�unately fouz feet and is cu�rcntly sho�un as �n. easement on the final <br />plat. MN-17of staff are a�vate of the overlap a.nd hatre indicated that they agree �vith ouY nott� Iine of <br />the south seven ac�cs and are �villi�g to give the overlapping portion to Aeon. At this point, rleon <br />does not 1�na�v when o� by �vhat tnethod I��IN-DOT' w� give l�ack the orerlapping parcel. rleon staff <br />and r�eon's surveyar are euriendy working to resolve the issue. The four footi ovetlapping section <br />does not impact Phase I reconst�uction acuvities. <br />�mptovements in the Triangle o£ Land Bordering the Northw�st Corner oi the Site <br />The PUD plans show d�iveway access to the Pl�ase II biiilc�g and a. rain garden in t�e triangle of <br />land. Howevet, the final pIat does not sho�v th�se imp�ovements. r'�s outlined in rhe PUD <br />application, the o�vner of the triangle is unknotvn, and IvIN-DQT has an easement o�rer �t £or <br />hightvay �urposes. rleon and the Cit�� have becn �vorkii�g �vith i��N-DC�T to obtain the easement o� <br />secu�e the necessa�-�T approvals to construct the improvements during Phase II af the project. <br />�'age 2 of 3 <br />1625 I'aYk rlvenue, l�tinneapolis; I1�T �5404 61?-341-3148 612-341-�208 F' �v�v�u.aeomm�.org <br />