Laserfiche WebLink
2010 — 2019 Capital Investment Plan <br />Item: Street Lighting Division: Public Works <br />Year: 2010 - 2019 Cost: $70,000 <br />Status: Unfunded <br />Description: <br />City-owned street light poles will require replacement at the end of their useful lives. Poles <br />along the Prior/Perimeter Drive and Co Road S2 Sridge segments have been identified as being <br />in need of replacement. <br />Justification: <br />See above description. <br />Zding Sources <br />Property t�es <br />Other <br />Total Sources <br />Other <br />Total <br />Funding Sources <br />Property t�es <br />Other <br />Total Sources <br />Costs <br />� �, � ��� <br />a� <br />� �, ���� <br />�- <br />�- <br />� �, i iii <br />a� <br />� �, � ��� <br />� <br />■ <br />� <br />� <br />� <br />� <br />■ <br />� <br />� <br />■ <br />m <br />� <br />� <br />� <br />■ <br />� <br />� <br />■ <br />m <br />� <br />� <br />� <br />■ <br />� <br />� � � <br />) 2011 2012 2013 2014 2015-2019 <br />�----- <br />������ <br />a����� <br />������� <br />Other $- $- $- $- $- <br />Total Ex enditures $ - $ - $ - $ - $ - <br />** No operational costs are shown. There is no significant change in operational costs. <br />.o - <br />$- <br />� <br />■ <br />m <br />� <br />� <br />m <br />■ <br />� <br />51 <br />