Roseville Skating Center and City Hall <br />Feasibility Study September23, 2007 <br />Speed Skating Oval <br />The only building connected with the speed skating oval is the refrigeration room and the <br />garage / service shop adjacent to the refrigeration plant room. The building is <br />approximately 2,860 square feet in area. The building is heated with gas unit heaters <br />suspended from the ceiling. <br />Hot water used to resurface the ice on the speed skating oval is heated with a natural <br />gas water heater. <br />2.2. City Hall / Public Safety Building <br />The City Hall and Public Safety Building was constructed in two phases. The original <br />City Hall was built on two levels of approximately 13,440 square feet per level for a total <br />of 26,880 square feet. Both floors are used primarily for office space and meeting rooms. <br />The Public Safety Building was added to the existing building in 2003. The main level <br />office space totals approximately 20,390 square feet. Approximately 3,490 square feet of <br />the lower level is used for offices and meeting rooms and 16,900 square feet is used as <br />a parking garage. <br />City Hall <br />The distribution system in the City Hall is designed as a forced air system, with one air <br />handler for the main floor and one for the lower level. A direct expansion cooling coil is <br />installed in each air handler. <br />A variable air volume (VAV) distribution system is designed for each of the air handlers. <br />The control system is designed to deliver air to the individual zones (offices, meeting <br />rooms, etc.) at approximately 65°F. Hydronic heating coils located at the VAV boxes in <br />the zones reheat the air if the temperature in the room drops below the thermostat <br />heating set point. A natural gas boiler provides hot water to the air reheat coils located at <br />the VAV boxes. <br />This design creates a heating demand in some of the building zones during the cooling <br />season. <br />Public Safety Building <br />The Public Safety Building was built in 2003 as an addition to the City Hall. The main <br />level is used primarily as office space and meeting rooms. Approximately 1,300 square <br />feet of the main floor allows vehicle access for shipping / receiving etc. Most of the lower <br />level is used as conditioned vehicle parking space. <br />The office area mechanical system is very similar to the system in the City Hall. A roof <br />mounted cooling unit provides 60 tons of cooling capacity. The office area is zoned with <br />VAV boxes. Air to the individual zones is reheated if necessary to meet the temperature <br />set point for the zone. The lower level parking area requires significant amounts of <br />ventilation. This is accomplished with an exhaust fan controlled by a carbon monoxide <br />sensor. <br />Geo-Xergy Systems Page 4 of 33 <br />