Roseville Skating Center and City Hall <br />Feasibility Study September23,2007 <br />Iniegrating ice storage in this manner reduces the peak electrical draw in the Banquet <br />Hall by approximately 25 to 50 kVV depending on the capacity of the thermal ice storage <br />tanks. In addition to the peak demand reduction, the amount of equipment that must be <br />installed and maintained is reduced.' <br />Bergerson Caswell [nc. is a drilling company specializing in the installation of vertical <br />GHX systems. This company has installed vertical GHX systems in the Minneapolis <br />area, and has indicated that a vertical GHX can be installed for approximately$11 to $12 <br />per foot (including piping to and from the buildings, fluid, etc.) <br />An estimate of the size of the GHX large enough to accommodate the loads for the ice <br />Arena ! Banquet Hall facility is a vertical GHX with approximately 50 boreholes to a <br />depth of 200'. The total estimated cost of the GHX is $120,000. <br />The following chart summarizes the estimated costs for Options � and 2 for the Ice <br />Arena / Banquet Hall <br />Figure 22: Shows a comparison between Option 1 and Option 2. There is an estimated cost <br />difference of approximately $421,000. Note that option 2 provides for the replacement of the <br />rooftop units as well as the addition of the GHX, and includes the cost of a thermal storage buffer <br />underthe floor. <br />Arena Dehumidification <br />The existing dehumidification equipment in the ice arena appears to be operating <br />effectively, and appears to be well maintained. When major repairs and maintenance is <br />required for this equipment, it will be possible to integrate the dehumidification, heating, <br />cooling and ventilation requirements of the ice arena into an integrated unit that makes <br />use of the refrigeration and waste heat recovery capability of an integrated system. <br />Maintenance Cost Comparison &. System Longevity <br />A conventional refrigeration system is considered industrial equipment. It is designed for <br />long-term, heavy usage. Most facilities develop a regularly scheduled maintenance <br />program to ensure the longevity and efficiency of the equipment. Several facility <br />operators in the United States and Canada have reported that they allow an annual <br />budget of $12,000 to $16,000 for maintenance such as rebuilding of compressor units, <br />replacement or repair of the cooling tower, testing and maintaining the secondary <br />refrigerant fluid, repair of a chiller barrel, etc. <br />Over twenty integrated geothermal ice rink systems have been installed in the U.S. and <br />Canada before the year 2000. Their experience has shown significantly lower annual <br />� ice Kube Systems: "Integrated Geothermal lce Storage Systems"- Ed Lohrenz, June 2005 <br />Geo-Xergy Systems Page 25 of 33 <br />