Laserfiche WebLink
City of Roseville 2007 Fee Schedule <br />Demolition Permit Fee: <br />���: � �,� �� � ��, � <br />�._I.....�. . ` �i•,•_ •} ,•. .L. �7.'.�ti.11''' I'•I'i�7" .. �"II' •_��I'_ 'Ij�. �,�� I��I <br />Structures not connected to utilities 55.00 <br />Residential structures connected to city utilities 110.00 <br />Commercial structures connected to city utilities $250.00 <br />Electrical Permit Fee: <br />Set through yearly contract with Contract ElectricalInspector <br />;;, � {y �'u;l <br />� 56.00 <br />114.00 <br />$257.00 <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8°/o) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000) <br />Gradin� Plan Review Fee: <br />50 cubic vards or less <br />51— 100,000 cubic yards <br />100,001--- 200,000 cubic yards <br />In excess of 200,000 cubic yards <br />[ $0 <br />$52.75 for the first 10,000 cubic <br />yards, plus $26.25 for each <br />additional 10,000 yards or <br />fraction thereof <br />$288.95 for the first 100,000 <br />cubic yards, plus $14.20 for <br />each additional 10,000 yards or <br />, fraction thereof <br />$430.89 for the first 200,000 <br />cubic yards, plus $7.77 for each <br />additiona110,000 yards or <br />fraction thereof <br />$54.00 for the first 10,000 <br />cubic yards, plus $27.00 for <br />each additional 10,000 yards or <br />fraction thereof <br />$297.00 for the first 100,000 <br />cubic yards, plus $15.00 for _ <br />each additional 10,000 yards or _ <br />fraction thereof � <br />$444.00 for the first 200,000 ; <br />cubic yards, plus $8.00 for each � <br />additiona110,000 yards or � <br />fraction thereof <br />