My WebLink
|
Help
|
About
|
Sign Out
Home
2007_0212_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2007
>
2007_0212_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 12:37:15 PM
Creation date
8/26/2009 3:20:01 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_�.,{.' LL_ �_. t�. _ . <br />i , _ �'1 , _�.�I�f }�_ � _ f r l_ <br />� � � ����� <br />�� ��� <br />i�����`r <br />January 9,2007 <br />,�.�.�.f�....-. _ _ <br />Debra M. Bloom, P.E. <br />City Engineer <br />City of Roseville <br />2660 Civic Cez�ter Drive <br />Roseville, MN 55113 <br />Dear Debra: <br />I was revisiting some thoughts from last night's meeting and since I will not be in town <br />on the evening of the public hearing, January 29�', decided I would put my thoughts in <br />writing. Please feel free to share them with wl�on7e�ver you think would be appropriate. <br />First, I would like to offer some general comments. Instead of focusing on the amount of <br />money we have spent to patch the roads in our area I would like to focus on what can be <br />done to reduce the need for repairs in general. Having multiple garbage trucks and <br />recycle trucics going through on different days af the same week and even trucks from the <br />same company coming tl�au�h more than once a week is unnecessary and damaging. It <br />would seem that some major efficiencies could readily be implemented if Arden Hills <br />and Roseville utilized cooperative strategies. The same thing applies to plows. Is it not <br />possible for Arden Hills to do the plowing one year and Roseville the next without both <br />towns sending heavy equipment into the area for the saxne storm? The roads would <br />undoubtedly last longer if they were not subjected to repeated heavy equipment use. I am <br />of the opinion that much of the money recently spent for patching could have been <br />avoided if our roads had not received this big equipment abuse. <br />Second, my preference is to have the "Arden Hills —Roseville triangle" which includes <br />Roseville area 10 done �r� its entirety and at the same time. However, the location of this <br />small parcel and the limited egress should not only allow us but also encourage us to find <br />a way to reduce the inconvenience and detrimental aesthetic impact. Additionally since <br />"bundling of road projects" seems to favor a reduction in cost per square foot I would like <br />to encourage consideringbundling together with neighboring cities. The most obvious <br />for us at �Iais point would be to consider bundling with Arden ���t�s. I��zzzak this should <br />be considered for this project whether it be done in 2007 or later. I am concerned that if <br />this project were delayed to 2008 that there would be no remaining Roseville areas with <br />which to "bundle". <br />Third, if doing the entire segment (both Arden Hills and Roseville) concurrently is not a�� <br />option then I would encourage completing from Roseville to Gler�hi�� Drive at one time. <br />The egress patterns alone make this option especially enticing. And, if that is not an <br />option then my next choice would be to take the borderline properties that are "split <br />between municipalities" and, have them included at the time Arden Hills does the <br />reconstruction of their segments. That way no individual property owner will be <br />
The URL can be used to link to this page
Your browser does not support the video tag.