Laserfiche WebLink
0 <br />Regular City Council Meeting <br />DRAFT Monday, March 12,2007 <br />Page 10 <br />1 Base Bid: <br />� Lump sump for all labor, materials, equipment, and services necessary for <br />3 and incidental to the construction of the Roseville Skating Center south en- <br />� tryway addition and remodeling proj ect <br />� <br />� <br />� <br />� <br />� <br />�� <br />11 <br />I? <br />�� <br />1� <br />Alternate #1: <br />Revising the main roof structure to be constructed with pre-engineered <br />wood, scissor trusses, 518" plywood sheathing, 12' fiberglass batt insulation, <br />and 518" gypsum board with a vapor retarder in lieu of the proposed steel <br />beam, deck and insulation panel <br />Alternate #2: <br />Add the basement space under the new main lobby floor <br />1 � Alternate #3: <br />1 r� Delete the sheet metal roofing and install asphalt shingles and delete the <br />1� sheet metal siding and install l' stucco over specified sheathing <br />l t3 <br />t� <br />..�� <br />�l <br />��� <br />�;� <br />�� <br />�5 <br />L� <br />�� <br />�� <br />�� <br />Alternate #4: <br />Add additional rubber flooring <br />Alternate #5: <br />Add automatic door openers to the south eniryway doors, including push <br />button bollards; also to include automatic door openers to the northern most <br />door of the north entrance to the banquet center entrance <br />Alternate #6: <br />Add solid surface counter tops in lieu of plastic laminate over particle board <br />;�[� Alternate #7: <br />:� ] Delete the exterior brick veneer and substitute "rock face' concrete block <br />3� veneer for all exterior walls of the addition <br />�� <br />�� <br />�� <br />�� <br />�'� <br />�� <br />�f� <br />Alternate #8: <br />Add slab tubing, piping, and controls to heat the entrance stoop, steps and <br />sidewalk area <br />Alternate #9: <br />Add cost of res�room remodelingproject <br />