My WebLink
|
Help
|
About
|
Sign Out
Home
2007_0423_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2007
>
2007_0423_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 12:38:43 PM
Creation date
8/26/2009 3:21:37 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- "_ r -- r��'ti� '_' - ' " <br />— DRAFT T�r�neline for Roseville Facility Referendum on <br />—� November 5,2002 <br />Apri1 <br />22: Council sets Timelin� <br />29: Staff prepares and Council reviews and tentatively approves sul�- <br />components for Public Safety and Public Works facilities <br />��Y <br />6: Council approves contracts for specialists (e.�. architect) to develop <br />more detailed plans and drawings based on sub-components <br />tentatively approved � Council <br />Mav-June <br />� Architect drafts designs for facilities based on sub-components <br />Council has approved <br />. Staff drafts public information - but not advocacy -- pieces: <br />o Single sheets....... VVebsite information....,......WRAP article <br />Channel 16 screens .............PflwerPoint presentation <br />Newspaper notices and other public information pieces <br />Julv <br />15: Council reviews architectural concepts and information pieces <br />�-- 15- Council gives feedback about facility design and information pieces <br />29: <br />29: Council approves architectural concepts and information pieces <br />Au�u.st <br />. Architect prepares detailed cost estimates based on facility designs <br />approved by City Council <br />� Staff finalizes information pieces based on Council direction <br />� In conjunction with Bond Counsel and the City Attorney, Staff <br />prepare proposed ballot language based on project design and <br />costs approved by Council <br />12: Staff presents proposed referendum ballot language to Council; <br />Council gives feedback and direction regarding ballot language <br />19: Council approves ballot language and directs that a special <br />referendum election be held on November 5 pursuant to the ballot <br />language approved � the Council <br />September,=0ctober <br />• Concentrated public information efforts <br />November <br />�� 5 Roseville Facility Bond Referendum Election <br />
The URL can be used to link to this page
Your browser does not support the video tag.