My WebLink
|
Help
|
About
|
Sign Out
Home
2007_0618_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2007
>
2007_0618_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 12:41:17 PM
Creation date
8/26/2009 3:26:28 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approvals <br />REQUE�T �'OR COUNCIL ACTI4N <br />Manager Reviewed: <br />A�enda Section: <br />DATE: 6/18/4'7 <br />iTEM NO.: � Q, j <br />Ite� Deseription: R�solutron€ approving�ans & speci�ca�ions for County Raad C Streetscape Project. <br />Bacl�ground; At the April i 6th, 2007 worksessio��, staff presen�ed the status of the Courzty Road C streetscape <br />project ta tl�e City Counei�, Tk�e next step iia the process is for the City Council to apprave plans and specifications <br />and autk�orize t�ae advertise�nen� far bids for ti�is project. The Pro,ject i�zcluc�es: <br />• Pedestrian sidewalk connectipn wader the I-35W bridge far the County Raad C regional pat�way. <br />• Make corridor landscaping improvements along the baulevards ar�d nnedians by iz�stalling 4S�a perenr�ials, <br />S77 orna�nen�al trees, and 164 over-story trees aiong the e�tire ler€gth of County Aoad C between Long Lake <br />Road and O��'aard Street. <br />• Landscapi��g fo� the stoa-�x► water facili�ies at �I.oward �oht�soiX Park, City Hall, and Ox%rd Pond with 614 <br />shrubs, 3 i OQ i�ain garden plants, & split rail fence. <br />• Ciry Ha11 si�nage at the northwest corner of County Road C and Lexington. <br />fiinancial ��ap�ieations: �n 2002, the City applied for and received federal funding for �l�e streeiscape project. Tize <br />original grant vvas for $1,000,000 which has been adjusted for inflation to $1,130,Q00. These federal �unds can <br />provide up io arz 80/20 matc�. Ir� addition to these matching construeiion funds, tihe City is funding the design <br />costs. W1xen tl�is project was approved, the City Coui�cil request�d that we erraphasize landscaping and eliminate <br />tl�e "non-fi�nctional" stceetscape elexnents. M.any nf the streetscape elemel�ts, znc�uding pedestrian lighting, a <br />cent�r median, arid colored concrete, were constr�cted by Ramsey Co�nty as a part of their reconstructian praject. <br />As a result, tl�e expected cost ofthis prajeet is less than th� arigi��al grant. �Ne have campleted tk�e plans and have <br />p�t tage�her a revised engi�eer's estimate for this prpj�ct. <br />Federal Construction �'unds (80%) $608,594.$0 <br />�,ocal Construction �unds (20%} $152,148.70 <br />Total Estimated Constructian Cost $76�,743.50 <br />Project schedt�le: I�approved, �he following sch�dule is propos�d: <br />.�uxae 22, 200� P1ans to �'edera] Aici �'c�r review <br />August 22, 2007 Bid apeni�g <br />August 27, 2007 Council avvard of contract <br />Septemb�r 2Q07 Constz�uctioi� begi�s <br />Staireco�me�dation: It� arder to maintai�� tlte schedul�, it is recoininended thai tne Co�ncil apprave the pla��s <br />and speci�cations %r t�e project and order the adv�rtisernent for bids. <br />RECONIN�NDED COUNCIL A.CT�ON: <br />Aciaption of a resalution appraving plans and speci�cations aud ordering ti�e advertisement for bids for the Co�nty <br />Road C Sireetscape Project. <br />Prepared by: Debra Blao�n <br />
The URL can be used to link to this page
Your browser does not support the video tag.