Laserfiche WebLink
8. Replace Oval Tarmac <br />$ 50,000 <br />* Mill and blackiop perimeter of Oval <br />9. Replace �l�ate Park Equipment <br />$ 65,000 <br />� Replace current equipment with weather resistant pieces <br />* Possible addition of cli��lbir�g wall or otl�er axire��e sports apparatus <br />10. Replacement of Oval ri�k divider pads <br />$ 30,000 <br />> Replace pads used to divide �-�ntc for l�ocicey and other infield activities <br />� <br />� <br />� <br />i <br />� <br />a <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />I <br />� <br />