Laserfiche WebLink
ROSE V.��L�' �`� TING CENTER <br />Capital �t��pr^ave��e��t Needs <br />� �. �3uildiY�g �ntr�vvay Zr�zpravemenis <br />$ 250,000 <br />■ Improve customer flow through facility <br />■ Potential to add a profit center (i.e. restaurant or pro shop) <br />Possible expansion of Oval lobby <br />2. Oval Scoreboard Replacement <br />� 225,000 <br />■ Current techsialagy is outdated ai�d expensive to maintain <br />■ Provide better service for events <br />* Expand marlceting o�poztuni[ies <br />3. Oval Bleacher Seating and Resurfacer Pad Heating <br />$ 75,000 <br />� Provide heated seating to tl�e bleacher area of the Oval <br />■ Eliminate safety hazard by heating concrete pad near resurfacer entry <br />4. Install Gas Fireplace �nd Snow Melt Pit at Oval <br />$ 55,000 <br />r Additional "Warming Space" for Oval users <br />�- Snow Melt pit to dump resurfacer snow instead of piling and moving later <br />5. Renovate Banquet Facility 7�i�chen ai�d Bathrooms <br />$125,000 <br />* Expand current unisex bathrooms to separate men and women's bathrooms <br />• Expand current lcitchen to attract groups for larger banquets <br />G. Sound System Upgrade <br />$ 50,000 <br />� Update existing sound system to latest tecl�iology to better serve user needs <br />* Upgrade will allow better sound control, less dis�-uptior� for neighbors <br />_ '�. Install Facility Monitoring Equipment <br />$ 35,000 <br />— ■ Install cameras for monitoring activity tluoughout enormous facility <br />■ Install security monitoring controls for building access points <br />� <br />I <br />i <br />: <br />� <br />F <br />� <br />i <br />� <br />� <br />� <br />� <br />� <br />