Laserfiche WebLink
City Cou�c�� Regular Meet�ng — 01/09/06 <br />DRAFT Min�tes - Page 11 <br />7. Public Hear�ng for Raselaw�n Avenue Street Reconstruct�on <br />Projec� <br />Public Works D�rector Duane Schwartz and Czty Engineer Debra <br />Bloom presented general information regarding construc�ion, <br />standards and assessments �hat would app�y fo�r this joint project <br />o� the Cities o� Rosevill� and Fa�con �-ieights. Ms. Bloom no�ed <br />�hat Rose�awn was a£o�me� Ramsey County road and had <br />reeent�y been �umed back. Ms. Sloom noted that Ramsey <br />County wou�d participa�e in the cost sha�re �o� �econstruction, <br />w�th �he z-emainder to be shared on a Sa°/a-50% basis between �he <br />tr�o cities. <br />Ms. Blaom re�erenced the recently-distributed Feasibility Report <br />for the Roselawn Avenue Reconst�uetion Project; recen� <br />neighborhood inpu� and informational meeiings. Ms. Bloom <br />further reviewed road alignment, park�ng, sidewalk and storm <br />water z-ecommendations; along wiih finaneial implicaiions and <br />the cos� estimates and aptions for the Falcon Heights and <br />Rosevzlie sha�res xespectively. <br />Ms. Bloom reviewed the City's current assessmen� policy; wi�h <br />staf� recommending that the City proceed with Optzon B as <br />outlined in the Requ�st far Counci� Aciian dated January 9, <br />2006; using �he centerline length o� Roselawn Avenue, at an <br />estima�ed assessmen� ra�e o� $28.05 per foot. Ms. B�oom nated <br />that th�s wou�d be consisient wzth th� areeent �outh Owasso <br />Boule�ard pro�ect and would b� in keeping with past practice. <br />Ms. B1oom reviewed potential assessmeni de�erra� cri�eria; and <br />noted that the individual replacement of sanitary sewer ��nes and <br />driveway� could be incorporated into the p�oject at resident co�t. <br />Ms. B�oom outlin�d funding, including State Azd (M�A} costs; <br />Ramsey Caunty cost share; assessments (at 4ption B) and utilily <br />funds �or water infrastructure replacemen�. <br />�s. Blaom canc�uded by rev��wing the work plan and schedule, <br />noting the Public �earing held tonight and continued to the <br />January 30, 200F> mee�ing; with cons�ruction schedu�ed to begin <br />in May of ZOQ6 and anticipated �o�r completzan in August of <br />240b. <br />Public Hea�ring �or <br />Roselawn Avenue <br />5treet <br />Reeonstruct�on <br />Project <br />